|
Education
<br />as, Olvil Enginopring, University
<br />of Oallromia, h4no
<br />04tifloatiort/l.floonse
<br />Profsosloml Englocion OA,'JT
<br />Areas of Expertise
<br />• Well Eq'itpping Planning and.
<br />Docign
<br />• Pipallno Planning and Design
<br />Program Manni;Dment
<br />Projeat Pollvery
<br />GroundwaterSuppiY
<br />PumpWation Planning and
<br />Deoign
<br />- ResorvoirStaragePlanhIng
<br />and Design
<br />- Drinking Water
<br />Experience
<br />professional Activities
<br />AWWA,ASOE�AMTA
<br />uA-NvAwwA,
<br />OAWatarRouseAwo.
<br />Hazen
<br />Cindy Miller, PE
<br />Wator/WastewlwterTeam Lead
<br />M& Miller has -extensive experiencein the
<br />planning, design and construction ofivatersupply,
<br />treatment, storage and conveyancefacilities,
<br />Herassignments have included providing Program
<br />fbra $150 Million gratindWaterSupplyproject, whichincludes pipelines,
<br />Wojlll� Ptimpretatiolfil, and an advanced treatment system for RA con-
<br />rentrato reduction, ProjectManagar fbr preliminary andfinal design of
<br />is 2s MGD mlerofiltratlon treatment facility, and Project Manager for a
<br />w MGJ) ILO./Ion Exchangegrouridwater tredtmentplant,.Vis, Miller has
<br />also led numerous water storage and conveyance infrastructure projects,
<br />Including design (if over 100 miles of Ductile Iron, CML&C steel. PVC,
<br />and HDR pipeline, desiga of steel, pre -stressed concretc,and,cast4n-
<br />place concretestorage reservoirs, tip to io milliongallons, and numerous
<br />pump station facilities, She has led feasibility and planning studies,
<br />developed treatmentproce§s eviduatimisand life -cycle cost evaluations,
<br />participated DiValuo engineering studies and.op.orations.evaluations,
<br />Site' has fleV41oped detailed designs of many systemsand provided ro�n-
<br />structimt and startup services, Shebas experience with,diferent project
<br />delivery methods Including-. deslgn�bld-bulld, desigo-build AN de-
<br />sign -build -operate -finance,
<br />Oity of Santa Ana Well 20 Improvements Alternatives Analysis,
<br />Sant4Ana,.QA
<br />Principal to Charge. The City of Santa Ana owns and operates Well 29,
<br />located atthesdutheastcoraerof FIDwerStreetandFirstWeet, adjacent
<br />to City owned tennis courts. well 29 pumps directly to an existing a MG
<br />reserVoir. The existing well site Includes the wait head aittl discharge
<br />pipla,gassumbly, control equipment, achlorination sYsteirt In a building,
<br />and an SCH transformer. An alternatives analysis was conducted to rec-
<br />ommend upgrades at the site Including site Improvements, structural,
<br />mechanical , and electrical upgrades. Highlights of the study Include
<br />developing thre4 (a) alternatives for the Improved site, providing sT)
<br />renderings for each site alternative, and developing a prelfirl nary 6plil,
<br />ton of probable cost for the design and construction of each alternative
<br />discussed. The City Is.moving forward. with Implementing the recom-
<br />mended alternative from this analysis.
<br />01
<br />0
<br />'�J
<br />S
<br />ZI
<br />25E-73
<br />
|