Laserfiche WebLink
Education <br />as, Olvil Enginopring, University <br />of Oallromia, h4no <br />04tifloatiort/l.floonse <br />Profsosloml Englocion OA,'JT <br />Areas of Expertise <br />• Well Eq'itpping Planning and. <br />Docign <br />• Pipallno Planning and Design <br />Program Manni;Dment <br />Projeat Pollvery <br />GroundwaterSuppiY <br />PumpWation Planning and <br />Deoign <br />- ResorvoirStaragePlanhIng <br />and Design <br />- Drinking Water <br />Experience <br />professional Activities <br />AWWA,ASOE�AMTA <br />uA-NvAwwA, <br />OAWatarRouseAwo. <br />Hazen <br />Cindy Miller, PE <br />Wator/WastewlwterTeam Lead <br />M& Miller has -extensive experiencein the <br />planning, design and construction ofivatersupply, <br />treatment, storage and conveyancefacilities, <br />Herassignments have included providing Program <br />fbra $150 Million gratindWaterSupplyproject, whichincludes pipelines, <br />Wojlll� Ptimpretatiolfil, and an advanced treatment system for RA con- <br />rentrato reduction, ProjectManagar fbr preliminary andfinal design of <br />is 2s MGD mlerofiltratlon treatment facility, and Project Manager for a <br />w MGJ) ILO./Ion Exchangegrouridwater tredtmentplant,.Vis, Miller has <br />also led numerous water storage and conveyance infrastructure projects, <br />Including design (if over 100 miles of Ductile Iron, CML&C steel. PVC, <br />and HDR pipeline, desiga of steel, pre -stressed concretc,and,cast4n- <br />place concretestorage reservoirs, tip to io milliongallons, and numerous <br />pump station facilities, She has led feasibility and planning studies, <br />developed treatmentproce§s eviduatimisand life -cycle cost evaluations, <br />participated DiValuo engineering studies and.op.orations.evaluations, <br />Site' has fleV41oped detailed designs of many systemsand provided ro�n- <br />structimt and startup services, Shebas experience with,diferent project <br />delivery methods Including-. deslgn�bld-bulld, desigo-build AN de- <br />sign -build -operate -finance, <br />Oity of Santa Ana Well 20 Improvements Alternatives Analysis, <br />Sant4Ana,.QA <br />Principal to Charge. The City of Santa Ana owns and operates Well 29, <br />located atthesdutheastcoraerof FIDwerStreetandFirstWeet, adjacent <br />to City owned tennis courts. well 29 pumps directly to an existing a MG <br />reserVoir. The existing well site Includes the wait head aittl discharge <br />pipla,gassumbly, control equipment, achlorination sYsteirt In a building, <br />and an SCH transformer. An alternatives analysis was conducted to rec- <br />ommend upgrades at the site Including site Improvements, structural, <br />mechanical , and electrical upgrades. Highlights of the study Include <br />developing thre4 (a) alternatives for the Improved site, providing sT) <br />renderings for each site alternative, and developing a prelfirl nary 6plil, <br />ton of probable cost for the design and construction of each alternative <br />discussed. The City Is.moving forward. with Implementing the recom- <br />mended alternative from this analysis. <br />01 <br />0 <br />'�J <br />S <br />ZI <br />25E-73 <br />