|
lEdtioatilon
<br />B-Si. 1994, OlvIlEnginooring/
<br />Water Mosour000, University of
<br />asilfornlaafirone
<br />Proligisolonal Engineer; OA.
<br />ortation Worikor
<br />nation Oradentlal,(TW10),
<br />O#IIfbrnIA,201f
<br />Areas ofExportise
<br />• Well Equipping Design
<br />• Pipollno Dosign
<br />Tremohletsillpellne
<br />Rehabilitation and Installation
<br />Planning and design of major
<br />water end WAstew6terfadiltles
<br />PUmpatatiorldoeign
<br />In-depth evaluation of system
<br />requirements for proposed
<br />new laollitiou as well ate for
<br />rehabilitation, upgrade, or
<br />roplaotunent of existing pump
<br />stations
<br />Experience
<br />6 22totalyeare
<br />- 11yearwithl-lazen
<br />Professional Activities
<br />Atnerioan 800lety of ONO
<br />Englneora,Momher
<br />Hazen
<br />Steven Conner, PE
<br />Water/Wastewater Toohnfoal Lead
<br />Mr Cohner is a prq&siohatcivil engineer with
<br />2,2years ofexperience in the planning �nd
<br />desig.n.ofwater infrastructure including
<br />production wells, pipelines, storage tanks,
<br />trdatlinent 8ystem; and booster stations.
<br />Mr, Colmer Is responsible for project rnacageinc4to design supervision,
<br />contract admiul litration, client ititerac. t1da slid didvetopmeftiri anldpergon�
<br />nel
<br />At, His expertise Includes, contplex pu pit d, liping
<br />M, Ig an p
<br />gn,
<br />slid construction phase oillstauce Including start-up and operation; of
<br />puirkpingaral treatnelitfatIRI& Mr, Conner coordinates all enghleorh(g
<br />support disciplines (elvil, Architectural, mechanical,
<br />elcarical, and Mci AurlAgprcjtQtde0gn and cdnatmetlon phase5.
<br />city of Santa Ana Well 29 Improvements AltarnativosAnalyals,
<br />Santa Ana, CIA
<br />Project Martagen The Cityef Santa Ana owns and operates Well 29, lo-
<br />cated at the southeast corner of glower Street and First Street,, adjacent
<br />to City owned reach; Courts, Well 29 pumps directly to an existing 8 MG
<br />reservoln Theexistlog well a Ite Includes the well head and discharge
<br />�plpingasscnibly� control equipm'ent, a chlorination system In a building,
<br />and an SCE transformer. An alternatives analysis was conducted to rec-
<br />ommend upgrades at the site Including site Improvements, structurali
<br />mechanical, and electrical upgrades. Highlights of the study Include
<br />developing three (a) alternailves for the Improved site, providing aD
<br />renderings for each site alternative,and developinga preliminary opin-
<br />lon. of probable cost for the design And construction of each alternative
<br />discussed. The City Is moving fbrward with Implementing the recom-
<br />mended alternative from this analyst$.
<br />Mojave Water Agency Regional Recharge and Recovery (RS)
<br />Pr*Qt,San Serhardino Oounty,.OA
<br />Design Manager - Wells, Pump Station, Recharge Facility, Turnout Va-
<br />c Ilitles Reservoirs, Disinfection System, and Pipelines. Mr, Conner
<br />provided engineering services to the Mojave Water Agency for the Be-
<br />glonal Recharge and Recovery (Ra) Project, a high -profile water supply
<br />project In Sari Bernardino County. The project will ultimately recharge
<br />Lip to 40,00o acre-feet per year of State Water Project water Into the
<br />Upper Mojave Riverflood plain forlater distribution to inemberagencles.
<br />'rhe Phase I project Included construction of six wells to extract up to
<br />25E-74
<br />
|