|
eduication
<br />nn_ i Yokoyama, PE
<br />ION
<br />Water/Wastewator Tephritoal Lead
<br />Mr* Ybkoyama is exp6rienced in project
<br />management and design qfwater and sewer
<br />pipelines, tit city.stre-ets. His background
<br />includes both the design oftewfacilities, as, well
<br />as rehabilitation ofoging existingfacilities.
<br />80,01vil Engineering, California
<br />$tAto F9lVt_oGhnloV61vprsltY, "'A
<br />Olty of SantaAnaWell 0. Improvement% Alternatives Analysis,
<br />Luls.ObJspo
<br />Santa Ana, OA
<br />Project Englaeer,,rhe City of Santa Ana owns and operates Well 29, 10,
<br />Oertifloation/l.loonso
<br />cated at the southeast corner ofTlower Street and First Street, adjacent
<br />Prof000lonal Engineer; OA, Ouam
<br />to City owned tennis courts, VV011 29 pumps directly to an existings MG
<br />reservoir, The existing well site:Includes themoll bead and discharge
<br />Areas,of Expertise
<br />piping assembly, control equipment, achlorination system to abuilding,
<br />• p1pollnee
<br />and an sCH transformer, An alternatives analysis was conducted to, rec-
<br />• PurnpStations
<br />ommead upgrades at the site Including site Improvements, structural,
<br />• Reservoirs
<br />mechanical, and electrical upgrades. Highlights of the study include
<br />� Master Plano
<br />developing three (s) alternatives for the Improved site, providing 81)
<br />o Hydraullo Modeling
<br />renderings for each site alternative, and developing a preliminary spin -
<br />ton of probable co at for the design and construction of each alternative
<br />Experience
<br />discussed. The City is. moving forward with Implementlag the recom-
<br />lstotal.yoars
<br />mended alternativefrom this analysis.
<br />lyearwithHazen
<br />West Grove Valley Pipelines, RivorylowrPipallnes, Santa Ana, OA
<br />Professional Activities
<br />Project Manager, Two projects with the City Of Santa Ana Included a
<br />OA-NVAWWA
<br />total of over i7,000 LF of Water pipeline design ranging In size. from
<br />OOWA
<br />8-Inch to 1;2-Inch diameter. The City is actively roplacingaging, and un-
<br />A8011
<br />dersized water mains throughout their distribution system. The West
<br />Grove Valley project include 9,soo LF of pipeline replacement design,
<br />The Riverview project included 7,7qo LF01plpellue replacement design.
<br />Waterli no RopfaPernent Projoot, Yorba Linda Water Distriot, Yorba
<br />Linda, Anaheim, and Placentia, OA
<br />Project Manager, Provided prelim [nary and final design and construction
<br />support services for the replacement of, seven pipeline segments, the
<br />replacementof one pressure-reducingstation, and the Installation ofone
<br />newpressure-roducing station. The pipeline replacements required many
<br />connections to existing pipelines, laterals, services, fire hydrants, and
<br />other appurtenances.
<br />25E-76
<br />
|