Laserfiche WebLink
eduication <br />nn_ i Yokoyama, PE <br />ION <br />Water/Wastewator Tephritoal Lead <br />Mr* Ybkoyama is exp6rienced in project <br />management and design qfwater and sewer <br />pipelines, tit city.stre-ets. His background <br />includes both the design oftewfacilities, as, well <br />as rehabilitation ofoging existingfacilities. <br />80,01vil Engineering, California <br />$tAto F9lVt_oGhnloV61vprsltY, "'A <br />Olty of SantaAnaWell 0. Improvement% Alternatives Analysis, <br />Luls.ObJspo <br />Santa Ana, OA <br />Project Englaeer,,rhe City of Santa Ana owns and operates Well 29, 10, <br />Oertifloation/l.loonso <br />cated at the southeast corner ofTlower Street and First Street, adjacent <br />Prof000lonal Engineer; OA, Ouam <br />to City owned tennis courts, VV011 29 pumps directly to an existings MG <br />reservoir, The existing well site:Includes themoll bead and discharge <br />Areas,of Expertise <br />piping assembly, control equipment, achlorination system to abuilding, <br />• p1pollnee <br />and an sCH transformer, An alternatives analysis was conducted to, rec- <br />• PurnpStations <br />ommead upgrades at the site Including site Improvements, structural, <br />• Reservoirs <br />mechanical, and electrical upgrades. Highlights of the study include <br />� Master Plano <br />developing three (s) alternatives for the Improved site, providing 81) <br />o Hydraullo Modeling <br />renderings for each site alternative, and developing a preliminary spin - <br />ton of probable co at for the design and construction of each alternative <br />Experience <br />discussed. The City is. moving forward with Implementlag the recom- <br />lstotal.yoars <br />mended alternativefrom this analysis. <br />lyearwithHazen <br />West Grove Valley Pipelines, RivorylowrPipallnes, Santa Ana, OA <br />Professional Activities <br />Project Manager, Two projects with the City Of Santa Ana Included a <br />OA-NVAWWA <br />total of over i7,000 LF of Water pipeline design ranging In size. from <br />OOWA <br />8-Inch to 1;2-Inch diameter. The City is actively roplacingaging, and un- <br />A8011 <br />dersized water mains throughout their distribution system. The West <br />Grove Valley project include 9,soo LF of pipeline replacement design, <br />The Riverview project included 7,7qo LF01plpellue replacement design. <br />Waterli no RopfaPernent Projoot, Yorba Linda Water Distriot, Yorba <br />Linda, Anaheim, and Placentia, OA <br />Project Manager, Provided prelim [nary and final design and construction <br />support services for the replacement of, seven pipeline segments, the <br />replacementof one pressure-reducingstation, and the Installation ofone <br />newpressure-roducing station. The pipeline replacements required many <br />connections to existing pipelines, laterals, services, fire hydrants, and <br />other appurtenances. <br />25E-76 <br />