Laserfiche WebLink
is,000 acre-ftperyear, OVer16 miles Of 12-lach W484aah diameter pipe, a 2,65 MG welded steel reservoir, a <br />flow control,;nd recharge.fatUfty with 40,000 9pul capacity And tip to,285 polprosouro drdp,.a pump q.tatiou. <br />sized for 2 s�000 gpm with pumpsinstAlled to provide is,00 o gpm, and four turnout flow control fac Iltles for <br />delivering the water to member agencies, <br />Sellflower High Oapaolty Wolf, OftV of'Seliflowor, 13611flower, OA <br />Projectmanager, Prepared A preliminary design report and provided final engineering design, and consttue- <br />tion management and In4pectlon services for the well drilling and equipping of the city's new bigb-capacity <br />groundwater well. The well Is designed to produce s,soo gallons per minute of high-qualitygrouadwaterto <br />replace alarge portion ofthe city's water supplies. Electrical design services Included a motor control center, <br />a varlable-fraquency drive for the well pump, Interior and exterlorlighting, an -automatic transfer switchi and <br />an emergency diesel-fuelod generator. control design, included preparation of process and Instrumentation <br />diagrams and specification of cootr9l components toprovido consistent y with control components installed <br />in existing city facilities. Provided engineering support dutingtesting gad start-up ofthe well. <br />W0119.214nd 22 Wellhead Facilities and Pipeline*, Irvine Ranch Water 131striot, TUatIn,OA <br />TaskManager. Task manager responsiblefor the design of thewelthead facilities and untreated water p pe <br />I line, <br />Dollverablea Indluded plans, specifications and engineers estimates of probable construction costs. for each <br />the wellhead facilities and all pipelines. Well 21 and Well 22, with capacities ot&soo gpm. and <br />. 1,600 g-pra re- <br />spectivety, are submersibleturbine pump/ motor assemblies, Installed within vaults, and one wellisequipped <br />with a bladder -type surge tank, Project Included 7,000 ft. of 24-Inch steel untreated water pipeline, 13,000 <br />feet of 36-Inch steel product water pipeline and 1,700 LF of io4nch HDPF brine concentrate pipeline. The <br />pipelines requiredJack-and-bores to cross the OCTA Metrolink train tracks, an Orange County Flood Control <br />District channel, BNSF train tracks, a box Culvert, And Peter's Canyon channel, <br />Rehabilitation of Oollege Avenue Pump Station, Orange Oounty Sanitation Distriot, Oosta Mesa, OA <br />Engineer. Provided engineering services to Orange County Sanitation District for rehabilitation of college <br />Avenue Sewage Pump Station, Provided engineering and construction support services for the rehabilitation <br />ofthe College Avenue Sewage Pump Station. The design Included replacement ofpumping equipmentivIth new <br />dry-pit,gubmersIble pumps, structural rehabilitation of the wet -pit and dry -pit, a new ventilation system, a <br />oew odor control system, a new discharge valve vault for Iiitercoiiiiectiligdtialforcemaiiis, andanew concrete <br />block buildingfur the electrical equIpmentand controls, The design Included replacement of pumpingequip- <br />mentwith nowsubmersible.pumps and a new concrete block building to house the new electrical equipment <br />and controls, <br />Reconstruction of the Los Alamitos Pump Station and Retarding Basin, Oountyof Orange, OA <br />Pump Stationrechnicat Advisor, Prepared plans, specifications, and estimates for a new Boo cfq storm <br />water pump station with natural gas enginedrivea pumps to replace the existing Los Alamitos facility <br />for the County of Orange, Work Included final design for the pump station facility and retarding basin, <br />preparation of a value engineering report, final engineering report, hydrology and hydraulic routing, best <br />management practices for Improving water quality, Inspection and analysis of existing 2,400 lineal fbOt of <br />54-Inch discharge piping, Phase I and 11 environmental assessments, geotechnical Investigation, CEQA, and <br />permit processing, and coordination withagencles and homeowner associations, The pump station Includes <br />fourverfical mixed flow pumps with a design Capacity Of 129 MGD each. Each pump Is driven by a Isoo hp <br />dual -fuel engine (natural gas and propane). Engine related components Include a compressed air starting <br />system, primary and secondary Jacket water cooling system. natural gas primary fuel system, and propane <br />25E-75 <br />