|
documentation and resol.ims-Agency permitting, They tire experienced In taking a pr9jectfrom conosproort to final
<br />build out, and provide oriftrimentatcomollainoo. services 14 sopportof'oAn 80.0 Wristr'4010P ongirfooll QU
<br />'i mg! . r
<br />learn's environmental services Include: 050AMEPAdocurnentatlon, groundwater protection, environmental audits,
<br />environmental compliance,, natural restource investigations, stdrmwater management, and more,
<br />Storrin Drain Design and Drainage Analysis, Klmley-Hom's drainage engineering services Indudelhe design of
<br />Gana[$, detention bashib, culvert crossings, water control structures, diversion structureel purrip stations, and more,
<br />Our engineers have been called upion by numerous public agencles end major agricultural, Industrial, and residential
<br />developers to conduct preliminary studies mad drainage Consultation, prepare storhinwator management plans, perform
<br />watershed and floodplain analysis, prepare, storm drain master plans: and coordinate permit applications on their behalf,
<br />Structural Artalyrals. Kinilay-Hom's structural engineering team provides structural design and analysis for a range of
<br />major retaInIng structures, parking structures, roadway bridges, pedestrian bridges, to minor footings and , foundations for
<br />traffic signals, roadway signs, and storm dral I ri structures; Our structural engineers have extensive experience working
<br />with public agencies and are familiar with routine plan check processes for multiple agencies,
<br />Construction and Bid Support. Our team Is equipped with ihe latest construction managements. ystems and
<br />applications available In the Industry, These tools are scalable and, customizablo to fit the CAly's project needs. and budget,
<br />and to Integrate with the Oily's existing standards, Fronnsimple, time -tested forms and procedures, to advanced
<br />construction managenientand web -based systems, our toanit wilt deliver small and large projects on -time and
<br />under budoof while kaoulng the City up to date on a "nnfl-time" basis. In addition to our designWern's.exparlence
<br />with design relevant topics, our construction phase personnel can attend pre-ocinstruction conferences and r . egular project
<br />meetings, provide review and approval of submittals, as well as other activities necessary to achieve well-coordinallod
<br />construction projects of proposed Improvements.
<br />Approach to Your On -Call
<br />Through our five decades of experience workIng with oft -call dients,wo have learned valuable lessons that have helped
<br />us create a unique approach to meeting our ollents'needs, We understand the urgency associated with federally funded,
<br />time sensitive, or public safety projects, and we are equipped to allocate sufficient resources to meet deadlines and the
<br />City's capital Improvement program schedule. Our approach to your on -call tasks entails the following:
<br />Project Managernent—Single Point of Contact: We have widespread expertise, and experience In all facets of
<br />municipal projects, Klmley-Harri's project manager, Darren Adrian, P.E., Wil serve as the primary point of contact, and
<br />will manage the team through the length of the contract. He has over 27 years of municipal engineering experience and
<br />managed several projects with various cities In CAlliorrilit. His experience Includes design, planning, and construction of
<br />major roadways, transportation facilities, streetsoape improvements, and utilities and Is knowledgeable of federal, state,
<br />county, and municipal regulations. Darren will oversee and review the engineering activities Including engineering design,
<br />studies, Investigations, poor review, surveying, suboonsultant review, and other related activities. He will be available to
<br />City staff for a timely response to sarvloo, requests, Including questions about budgets, invoices, and schedules,
<br />Before a project starts, Darren will conduct a project scoping meeting with all respective team members to brainstorm
<br />the project Issues, Our team will conduct a project Initiation meeting with the appropriate team members to coordinate
<br />the project plan Incluffing milestones, dellvarables, and current project events. Project coordination meetings will be
<br />scheduled based on the project duration to make sure the project remains on track,
<br />City of Santa Ana I TROC77025.17 9 K i m be; ly >)> H o r n
<br />25E-99
<br />
|