Laserfiche WebLink
documentation and resol.ims-Agency permitting, They tire experienced In taking a pr9jectfrom conosproort to final <br />build out, and provide oriftrimentatcomollainoo. services 14 sopportof'oAn 80.0 Wristr'4010P ongirfooll QU <br />'i mg! . r <br />learn's environmental services Include: 050AMEPAdocurnentatlon, groundwater protection, environmental audits, <br />environmental compliance,, natural restource investigations, stdrmwater management, and more, <br />Storrin Drain Design and Drainage Analysis, Klmley-Hom's drainage engineering services Indudelhe design of <br />Gana[$, detention bashib, culvert crossings, water control structures, diversion structureel purrip stations, and more, <br />Our engineers have been called upion by numerous public agencles end major agricultural, Industrial, and residential <br />developers to conduct preliminary studies mad drainage Consultation, prepare storhinwator management plans, perform <br />watershed and floodplain analysis, prepare, storm drain master plans: and coordinate permit applications on their behalf, <br />Structural Artalyrals. Kinilay-Hom's structural engineering team provides structural design and analysis for a range of <br />major retaInIng structures, parking structures, roadway bridges, pedestrian bridges, to minor footings and , foundations for <br />traffic signals, roadway signs, and storm dral I ri structures; Our structural engineers have extensive experience working <br />with public agencies and are familiar with routine plan check processes for multiple agencies, <br />Construction and Bid Support. Our team Is equipped with ihe latest construction managements. ystems and <br />applications available In the Industry, These tools are scalable and, customizablo to fit the CAly's project needs. and budget, <br />and to Integrate with the Oily's existing standards, Fronnsimple, time -tested forms and procedures, to advanced <br />construction managenientand web -based systems, our toanit wilt deliver small and large projects on -time and <br />under budoof while kaoulng the City up to date on a "nnfl-time" basis. In addition to our designWern's.exparlence <br />with design relevant topics, our construction phase personnel can attend pre-ocinstruction conferences and r . egular project <br />meetings, provide review and approval of submittals, as well as other activities necessary to achieve well-coordinallod <br />construction projects of proposed Improvements. <br />Approach to Your On -Call <br />Through our five decades of experience workIng with oft -call dients,wo have learned valuable lessons that have helped <br />us create a unique approach to meeting our ollents'needs, We understand the urgency associated with federally funded, <br />time sensitive, or public safety projects, and we are equipped to allocate sufficient resources to meet deadlines and the <br />City's capital Improvement program schedule. Our approach to your on -call tasks entails the following: <br />Project Managernent—Single Point of Contact: We have widespread expertise, and experience In all facets of <br />municipal projects, Klmley-Harri's project manager, Darren Adrian, P.E., Wil serve as the primary point of contact, and <br />will manage the team through the length of the contract. He has over 27 years of municipal engineering experience and <br />managed several projects with various cities In CAlliorrilit. His experience Includes design, planning, and construction of <br />major roadways, transportation facilities, streetsoape improvements, and utilities and Is knowledgeable of federal, state, <br />county, and municipal regulations. Darren will oversee and review the engineering activities Including engineering design, <br />studies, Investigations, poor review, surveying, suboonsultant review, and other related activities. He will be available to <br />City staff for a timely response to sarvloo, requests, Including questions about budgets, invoices, and schedules, <br />Before a project starts, Darren will conduct a project scoping meeting with all respective team members to brainstorm <br />the project Issues, Our team will conduct a project Initiation meeting with the appropriate team members to coordinate <br />the project plan Incluffing milestones, dellvarables, and current project events. Project coordination meetings will be <br />scheduled based on the project duration to make sure the project remains on track, <br />City of Santa Ana I TROC77025.17 9 K i m be; ly >)> H o r n <br />25E-99 <br />