|
Relevant Projeot Experience
<br />Klmloy-Horn has enjoyed coltaborsting With tho� Clly on a variety of Civil, traffic, In the past,
<br />rrom 17th Street Grade Separation and Pirlstoll Street Southern California Edison corridor to 0O.Streetcar Deslorl Review.
<br />end Oth , 0 Lane projects, Klmleywfiomhas pprilnered,wIth the City to provIdeoxcoptlonal
<br />. Street and Santa BOWIOVard BIK
<br />sorylgo for Critical. proje*t W0,01so romptly started a now cotloborallion with the City on Its Main Street Corridor
<br />Improvement Project
<br />Our experience and Lessons learned from these projecis means the City can expect the right,0slance of technical
<br />expertise, responsiveness,, and valuable local knowledge to-successfully.00mplote your task order assignments,
<br />$477110rlRelrevent !�P.5.E)R�Ki�qce
<br />&'i..........................
<br />he following, pages we've provided a brldfllstof similar and relevant experience for clients end thevarloustypes of
<br />services weveprpykiedlo them foe your quick review,
<br />On -Call Traffic and Civil Engineering Services, City of linduft CA (2005 — Ongoing)
<br />Klmloy-Hornhas Provided oh-coll troffo and dill engineering services to the City ofindustry since 200. Since Initiation,
<br />we hove been Issu0mors than 130 tasks, focused pKinarilyon improving the transportation system within the City, Tasks
<br />antall developing gaomotrilo alternatives for major Intersection modifcations; ovalvalitip access points and presenting
<br />various alternatives for modifications at the Puente Rills Mall; attending project meetings on behalf of the City; ifilpirsootion
<br />oapoqlty analysis using SyniChro software: and traffic Int a an 1pis, sight distance evaluation, traffic handling design,
<br />P.Of a
<br />firaflo signal design, signing and stelpIng design,atreet lighting analysis and design, speed surveys, and poor end
<br />plan check reviews. Our on -call work Is conducted with the City Deportmentof Public Works and the Industry Urban.
<br />0evelopment Agency (IUDA).
<br />Client Reference: City of Indusly, Joshua Nelson, RIF,, Regional Woo President, CNO Engineering, 620.966,8288
<br />Anaheim, CA (2014 - Ongoing)
<br />KAmley-Rorn provided transportation planning and trafle engineering on -
<br />call services to the City on dozens of projects under multi -year contracts
<br />with the City's Planning and Engineering Departments, Services provided
<br />Include the preparation of parking studies and traffic studios for private
<br />development projects, as well as third-parly review of parking and traffic
<br />Studies prepared by oth6rs.
<br />Cllent Reference: City ofArraholtri, Rudy Etriam), Public Works Director,
<br />7U 786,6176
<br />Santa Ana Fit Cities, Santa Ana, CA (2016 — Ongoing)
<br />Klmloy4-lom worked with the City of Santa Ana and Latino Health Access to develop 9 community-4riven active
<br />transportation project that, when coNstructed, will encourage improved public health through walking or cycling. Using
<br />Information from stakeholder workshops with Lefino Health Access, fieldwork, and date collection, Klmley-Horn developed
<br />a conceptual design and visual rendering for the community preferred project and prepared a prelluilriary cost analysis for
<br />the concept.
<br />Client Reference: Cltyoffttaft, Cory Wilkerson, Active Transportation Coordinator, 714.647.6643
<br />KimlepMorn 12 TROC77025.171 City of Santa Ann
<br />25E-1 02
<br />0
<br />0
<br />(J)
<br />0
<br />(J
<br />0
<br />Ck
<br />
|