My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 18: Pofhollng.�qp�lqns A and B) <br />I—.. .... I ... I .............. . .... —1 ... 11 ... ................... ......................................... .......... <br />Our team will provide vacuum excavation potholeslo positively Identify utilities where conflicts may exist, This task entails <br />potholes with a depth of up to 15 feet, Potholing Information will be used to Identify potential conflicts with traffic signal <br />footings, now catch basins, wall footings, and water quality devices. <br />Dellverables, Pothollog report <br />Task 19: Bid Phase Support (Options A and B <br />by responding lR writing to Requests for In matJoJ)(RFJ)/ <br />to <br />clariffeallons, Our learn will assist the Car In the issuance of addends to the bid package which consists of making design <br />changes determined necessary to address clarifications. <br />Defiverables: Responses to Me, design revision. <br />Task 20: Construction ��pE?��qe��.A.and 13)., <br />......... * ........ I .. .......... — <br />sl4t the City during the Construction phase by responding to the Contractors RFIs, preparing addends, <br />and providing clarifications, 'rhis task Includes reviewing the Contractors change orders and changed conditions in the <br />laid. We will prepare record drawings by updating the approved design drawings based on one sot of redline markups <br />provided by the Contractor or City staff. The purpose of the record drawings Is to create 6 deliverable that Will represent the <br />built condition lb r the Cilys records, as recorded by the Contractor, Independent Verification Is not Included In this scope. <br />Defiverables., Record Drawings, One hardoopy and one elactiorild (PDF format and Microstation V81). <br />Schedule <br />The draft schedule on the following page contains the tasks outlined within the scope of work, as., well a.s necessary <br />agency review periods. Relationships are assigned to each task representing a logical progression and allowing easy <br />Identification of tasks that could constrain the project. Note that task durations and agency review periods are realistic <br />based on our recent experience on similar projects, Our Intent 19 to review thIs draft target schedule with you at the <br />kick-off meeting for each project, make any desired adjustments, and track as a progress soriedula.during the project by <br />providing updates on a monthly basis. <br />GKON41"TA <br />See separate sealed envelope for our hourly rate schedules, <br />City of Santa Ana 1171601702U.17 Kimley*Horn <br />2k'l 09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.