Task 13. Storm Drain Pla.nsfqe�n.p)
<br />.
<br />(I
<br />........ .... ......... .................................................. ....... ..............
<br />We will prepap storm drain plans showing proposed eatali basloaand lateral emootloaa to the existing main lines.
<br />Catch basin sizing, Inlet dimensions, and laterals pipe Sizes wtII be determined as pad o ' I Task 4. Potential ooplipts with
<br />G
<br />existing utifittes will be shown on pmfilea with approximate loostfori of utilities, per the utility agencies readily available
<br />C)
<br />r000rd.drawings. Storm drain plans Wil be. prepared at a scale of I 2V horizontal and V;; 4� vertical for profiles,
<br />DeNvorables: $0, 60%, end Final Man$, efectronlo files In Mforostagon V8( and PDP ((met plans willbe seated end
<br />aloned), and responses toprovious ravlow comments'lrom the Ciy.
<br />(J
<br />01
<br />Task 14, Street Light and Electrical Plans �qp�� 13)
<br />..................... ............... ...... ............................ ...... . . ........... ........................................ ......
<br />0
<br />Klmlay-Horn Wit prepare street light plans for the project, Plans will Incorporate street lighting along both sides of -the
<br />C)
<br />Street. We, Will conduct Voltage drop: calculations to-datarmine thewiring sizes. Part of this task wig Include coordInaffort
<br />with Southern California Edison to determine now and existing service points, We Wit provide aphotometrI4 analysis to
<br />detormlarequinad filuminatkin for the corrIdor,
<br />Deliverable s 30 Yo. 60, a n d Fin a/ Plans,, a A& otro n/a rites in Micros is lion V61 an d PDF (fin a I pia ns will b a at aled a i d
<br />sIgned?, and trapows to previous review comments from the'Gity.
<br />Task 15,1 Trafflic ns n
<br />.......... ........................ ....... ........ ......
<br />We Wit propaeo traffic signal plans to Incorporate ft now Improvements Sibno oroject area, Installation of olosod-olr6uft
<br />Wevislon (CCTV).. video detection, oDridults, and cablos or modification of eisino communication Systems Is anticipated
<br />within the project Ilmits and will be shown on the fr9fflo signal plans. Plans will show the connection to each s, Ignalized
<br />Intersect luntIllff-Ilto project limits. Pull box detalls And modification of condultsweeps for the signal Interconnect are.
<br />Included, The tmffjc signal modification plan will be prepared In accordance with current City and.Caltrans standards and
<br />will be prepared at a scale of 1. a 20'.
<br />Dallverables. 30%, 60%, and Final Plans, electronic riles In Mictostation VRI and PDF (finetplans, will be seated and
<br />sIgned), and responses toprovious review comments from the City,
<br />Task 16: Specifications (Options A and B)
<br />kim'"Ie"y"'H, *o"r*n' *w"Jil lilo"o'go"n, 't' h"a ... b'o' I 1'l`e'db' *y*'t'h'e' ... G'R'y,"B' id"'lie"m"s"'w"I i ib"a' .......
<br />described as reasonably required In the General Provisions and will be included In the Contractor's bid list References for
<br />the technical provisions to the City's Standards, and Standard Specifications for Public Works Construction (Greenboolo,
<br />Caltrans, or other appropriate Specifications will be shown,
<br />Dellverables, 30%, 60%, and Final Specifications, electronic files /a PDFand word format (Analspoolficallons willbe
<br />seeledandsignod), andresponses to previous revlaw comments fromthe City.
<br />Task 17: Opinion of Probable Construction Cost
<br />... ..........
<br />'4"t�ruo'fio"r *(Estimate)
<br />t
<br />kl�iey"Il'or'n' Co Co'�"t*s'
<br />based on quantities, for comparison to
<br />project budget end assist during the Contractor's bidding process, Unit prices will be derived from readily available current
<br />bid Information based on similar projects within the area. Dackup will be generated for lump sum Items, Contingencies Will
<br />be shown, as agreed upon with City stsff.
<br />Defiverables: 30%, 60%, and Final Estimates, electronic files In PDE
<br />A
<br />KimleylMorn Is 717007705,171 MY of Santa Ann
<br />25E-1 08