Laserfiche WebLink
00 <br />woo <br />*TWINING <br />Amir Ghavibazoo, Ph.D., Senior Pavement Engineer <br />Dr. AmIrGhavilbazwis the Senior Pavement Engineer at Twining, Inc. He directs and works on <br />pavement design, highway design, and engineering specifications. During hlograduals study, Amir <br />obtained extensive knowledge and expertise on Pavement Management Systems (MlcroP,61ar), <br />Pavement Evaluation and Pavement Rehabilitation Strategies. He Is an expert In calculating Pavement <br />Condltlon Index (PCQ through visual Inspection following the United Stated Army Corps of Engineers' <br />methodology, so well ab conducting Life Cycle Cost Analysis (ILOCA) rehabilitation otrategles for <br />pavements. Afnir has extensive practloal experience In asphalt pavement engkisering Including, <br />pavement deal, reserviation, pavement management, materials and P.Qnstrocilod, His <br />qn, rehabilitation, p <br />experience Inoludes; the characterizaton of r4bbotizod asphalt binders and developing mix designs <br />following $uporpave specifications. He works closely with cities andgovekmmarl� age . indes todovelop <br />unique. find specialized mix designs, pavement constructions Inspections, and pavement design <br />solutions, <br />Overview <br />In the Industry sInce 2014 <br />Joined Twining In 2014 <br />Education <br />Ph.D. In Civil and Environmental Engineering <br />North Dakota State University <br />Master of Science In Railways Engineering <br />Iran UnIversilty or Science and Technology, Tehran, Iran <br />Project Experience Summaries <br />• City of Huntington Beach, Nichols Lane Rahabliltation Twining performed Inspection and <br />material testing. on this project. AmIr served as project manager to assure the quality of th jo� <br />a <br />that was Wng delivered to the City, He oversaw the material sampling and testing and provided <br />technical comments to the Clty� He was also responsl4le for developing Cement -treated Wl mix <br />design for the City. <br />• City of Claremont, Foothill Boulevard Improvement Twining performed pavement evaluation <br />on approximately four lane miles of Foothill Boulevard In the City of Claremont to recommend <br />repair and rehabilitation strategies for the pavement. AmIr served as senior pavement engineer, <br />coordinating the required testing and preparation of the final recommendation and design, <br />Several alternative options woes provided to the City, Including mill and overlay, Cold In -Place <br />recycling, reconathictlon, and soil stabilization, <br />• Pavement Evaluation & Repair Recommendations at Various Parke '[Wrilng performed <br />network level pavement evaluation on approximately 20 loins miles of road In v6dous parks of <br />rorest Lawn In Southern California to develop a 5-year plan for rehabilitation of the road network. <br />Amir was the lead Pavement Engineer on this project, coordinating all required surface evaluation <br />tasks, date collection, Find preparation of the final report. <br />• City of El Monte, Ramona Boulevard Resurfacing Pavement Evaluation This project <br />consisted of repairing the PS&E and related construction documents for the 2014- 2015 STP-L <br />Ramona Boulevard Street Resurfacing project. Twining performed gootechnIcat pavement <br />mviltiAtIong And rMphilltAtion row.nmronndAlinns fnrthip nrnlAnt AmirpArvAd AR IFIA I)AVAMAnt <br />25E-145 <br />