<br />is,.Poc acre-ftperyear, OVer10 mile$ of 12-InCh to 484nchdiarneterpipe, 42.65MGwelded steel reservoir, a
<br />flowcootrola drecharge.tjacllttyl�lfh40OOOgpMCAPaClty,40 a
<br />n OUPtO.235PS�preSSUrC4rOp,-AptlMp t tion
<br />sizedform000gpin wIthpuraps Installedto provideisi000 gpm, and fburturnoutflow control facilities for
<br />delivering the water to mersiber agencies.
<br />ftliflower High OApsoltv Well, Oily of Soliflower, Sollflower, OA
<br />tion management and Inspection services for the well drilling and equipplu$ of the city?s new bigh-capacity
<br />groundwater well, The well Is designed to produce s,soo gallons per minute of high-quallty groundwaterto
<br />replace a large portion of the dity's water sqpplles. Electrical design services Included a motor control center,
<br />a variable-frequencyArIve for the well pumN Interior mid exterior fighting, an automatic transfer switch, and
<br />an emergency diesel-fivoled generator, Control design Included preparation of process and Instrumentation
<br />diagrams and SPOCIRCAIM OfcOlittol components to Provide von;latency with control components Installed
<br />In Q91stIng city facilities, vrovidedengincering support during testing and start-up oftho well.
<br />Wells 21 and.22 Wellhead Faollltles and Pipelines, Irvine Ranoh Water Distriat, Tustin, OA
<br />Taskmanager. Task managerresponalblel'brthe designefthewellbeadfacilitlea and untreatedwaterpipeline.
<br />Dellverables Included plans., spocificattions and engineers estimates of probable construction costs for each
<br />the wellhead facilities and oil pipelines, WOU 21 and Well 22, With capacities of 3,800. gpm an:41,600 gpin to-
<br />spectivtly, pre subinordble turbine pump / motor assemblies, Ififtalled withfavaUlts, and one well Is equipped
<br />with a bladder-�type turgetank. Project lucludodn000 ft. Of 244Uch steel untreated water pipeline, i3,600
<br />feet of aG-Inch steel product water pipeline and 1,700 LF of 10-Incb. HDPF brine concentrate pipeline. The
<br />pipelines requiredjack-and-bores to cross the OCTA Metrolink train tracks, an orange CountyFlood Control
<br />District channel, BNSF train tracks, a box culvert, and Peter's Canyon Channel.
<br />Rehabilitation of College Avenue Pump Station, Orange Oounty Sanitation DIstriot, Oosta Mesa, OA
<br />Engineer. Provided engineering services to orange County Sanitation District for rehabilitation of*College
<br />Avenue Sewage Pump Station, Provided engineering and construction support services for therchabillfatton
<br />ofthe College AvenueSewage Pump Station, The desIgnIncluded replacement ofinunpingequipmentwith. new
<br />dry -pit submersible pumps, structural rehabilitation of the wet -pit and dry-plt, a new vpntilation. system, a
<br />new odor controlsystem, a new discharge valve vault for Interconnecting dualforce mains, and a new concrete
<br />block building for the electrical equipment and controls. The design Included.replacement ofpumping equip-
<br />ment with new submersible pumps and a now concrete block building to house the new electrical equipment
<br />and controls,
<br />Reconstruction of the Los Alamitos Pump Station and Retarding Basin, Oounty of Orange, OA
<br />Pump, Station Technical Advisor. Prepared plans, specifications, and estimates for anew 800 cls storm
<br />water pump station with natural gas engine, driven pumps to replace the existing Los Alamitos facility
<br />for the County of Orange, Work Included final design for the pump station facility and retarding basin,
<br />preparation of a value engineering report, foal engineering report, hydrology and hydraulic routing, best
<br />management practices for Improvingwater quality, Inspection and analysis Of existing 2,400 lineal foot Of
<br />544nch discharge piping, Phase I and It environmental assessments, geotechnical Investigation, CVQA, and
<br />permit processing, and coordination with agencies and homeowner associations. The pump station Includes
<br />four vertical mixed flow pumps with a design capacity of 129 MGD, each, Each pump Is driven by a 13oo hp
<br />dual -fuel engine (natural gas and propane). Engine related components Include a compressed air starting
<br />system, primary and secondary Jacket water cooling system, natural gas primary fuel system, and provane
<br />25E-1 50