Laserfiche WebLink
Edueation <br />:80, Oivll EnAm6eirine., OwIrOM14 <br />state Polytoolinio University, $an <br />LuivVblspo <br />oartirloation/Lioense <br />Protbosional Engineer: OA, duarn <br />AreasotExpeMse <br />f Pipelines <br />• Purnp8tations <br />• Reservoirs <br />MastarPlans <br />Hydraullo Modeling <br />Experience <br />1yearwIthHazon <br />rre, * V'n <br />lon.Lukoyama, PE <br />ftter/Wastewater Teatinloal Lead <br />Mr, Yokoyarna is experienced in project <br />management and design ofwater and sewer <br />pipelines in city streets. His background <br />includes both the design ofnewfacilities, as well <br />as rehabilitation ofaging existingficilities. <br />Oily of Santa Ana Well 29 improvements Alternatives Analysis, <br />SantaAna,OA <br />Project Engineer. The City of Santa Ana owns and operates Well 29, lo- <br />cated atthe southeast corner of Flower Street and First street, adjacent <br />to Cityawned tennis Court$. Well 29 pumps directly to an existing 8 Mo <br />reservotr. The existing well site Includes the well head and discharge <br />p1plogassembly, control equipmento chlorinAtioneyoL teratnaballdIngi <br />and an SCE transformer, An alternatives analysis was conducted to rec- <br />ommend upgrades at the site Including site Improvements, structural, <br />mechanical, and electrical upgrades. filghlights of the study Include <br />developing three (�) alternatives for the improved site, providing 3D <br />renderings for each site alternative, and developing a preliminary opin- <br />lon of probable cost for the design and construction ofeach alternative <br />discussed, The City to moving forward with Implementing the recom- <br />mended alternative from this analysis. <br />West Grove Valley pipelines, Riverview Pipelines, Santa Ana, OA <br />Prolbaslonal AotIvitles Project Manager. Two projects with tile City of fanta Ana Included a <br />DA-NV AWWA total of over 17,000 LF of water. pipellue design ranging In size from <br />OOWA 84nehtot2-Inchdlarneter. The City Is actively replacing aging and un- <br />ABOS dersized water Inains throughout their distribution system. The West <br />Grove valley project Ineludegsoo LF of pipeline replacem. eat design. <br />The Riverview projectincluded 7,7oo IX ofp1pellne replacement design. <br />R=_ <br />Waterline Replacement Projeot, Yorba Linda Water Distriot, Yorba <br />Lincla, Anahelm, and Plactentla, OA <br />Project Manager, Provided prel Iminary and final design and construction <br />support services for the replacement of seven pipeline segments, the <br />replacement oforie pressure -reducing station, and the Installation of one <br />newpressure-reducing station. The pipeline replacements required many <br />connections to existing pipelines, laterals, services, fire hydrants, and <br />otherappurtenances. <br />25E-1 51 <br />