My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON -CALL ENGINEERIN13 SERVICES <br />We believe our best relevant experience are the projects that we have Completed As part of our <br />past and ongoing eta -needed contracts withsouthem California municipalities. We are confident <br />these post. Projects Will attest to our technical excellonco, responsible staff, and our complete <br />understanding of every aspect of an On -Calf EngIrrearing Services contract, Included on Page 3 <br />In our 800 for On-CallPinginserl4g Services submitted. to the City on October 26, 2017,16-a <br />client list of our existing California asneeded engineering services contracts. <br />Why Tetra Tech I <br />Our project team brings the following distinct advantages: <br />a Extensive City WaterlWastowater Design Experience., Our project team has completed <br />more tha 00 w;Aer/wqste.wAlaI' projects lot th <br />. n 001tyshoa.10 .0ur pooJoottearn kryowetbe <br />CitVs design requirements and Standards, preferred materials, and operational preferences <br />whIch will Allow us to complefe,desIgnA in the most oostmoffectlys manner. <br />Extensive On-Oall Engineering $orvices, Experience. Tetra Tech has provided similar <br />on-catif anolheering Services for over 20 clients In Southern California. Many of those clients <br />are repeat clients as Tetra Tech has delivered service and Innovative solutions on -lime, <br />wlthfft budget, and with a high level of quality. <br />Extensive Well Exp#rlenoe, During the last 1,6 years, memb i ers of our project team have <br />been Involved In the design and equipping of more than 16 water wells. Within Southern <br />Dallfornie. <br />In-house Ptdcess, Structural, Electrical, and Corifrof Capa611/116s, We have our own In- <br />house process, strootural, electrical, and control engineers who have all worked on previous <br />city projects. <br />Dedication to Clty� We believe our past 19 year relationship with the City shows our <br />Wntnitmerit to providing -the (,fly with high quality service. We have been Awarded repeat <br />work with the City due to our quality and responsiveness as well as the trust formed with the <br />City Water Resources staff. <br />Our extensive experience with similar projects will ensure that the City will receive a high level <br />of service delivered by qualified, knowledgeable engineering professionals. Highly meticulous <br />and coherent plans and specifications greatly benefit all project, stakeholders, with the largest <br />benefit realized by the Owner, Quality Contract documents clearly lead to a larger number of <br />bidders, lower competitive bid prices (!us to increased competition, the cOrttraotor has less to <br />assume and take the risk for, and a greater overall comfort level In our design based on a long <br />history of successful projects), and lowest overall cost while achieving a very high quality end <br />product (quality contract documents mitigates the potential, and Impact of change orders, and <br />sets forth a standard otquality the contract must achieve). <br />No two projects are the same, although many are similar. The key Is to LaIlIze elements of work <br />that have been successful and apply to this project, and Continue to Improve construction <br />efficiencies without lowering quality based on contractor feedback. Our goal Is to provide the <br />nocassary expertise and resources to deliver the project on -time, within budget and In <br />compliance w1th'the design And construction standards set forth by the City. Tetra Tech Is <br />especially proud of Its high level of repeat customers, which we attribute to our dedication and <br />commitment to quality engineering and client satisfaction, Thus, we Invite you to contact our <br />references regarding our past record of performance, client relations, and project satisfaction, <br />City oflltanta Ana .3- TETRA TECH <br />25E-1 68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.