My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON -CALL ENGINEERiNG SEFiVirEs <br />The Tetra Tech Team <br />Tetra Tech has apsembled a project team that possesses the knowledge, experience, land <br />entbusloom necessary to successfully complete this project. Our Pmjeot Team Is devoted to <br />completing your project within schedule and under - budget, find not only meet, but exceed your <br />expectations. On the next page Is ah oNanizational charl of the Project Team. <br />Project Manager <br />Providing the team oversight to one of Tetra Tech's most eXpelishced Project Managers, <br />Mr. Tom Sipporisori, PE. Mr. Epperson has over 32 years of experience devoted entirely to <br />wastewater, water, and recycled water facility projects.and has been responsible forcompleting <br />the dotigh of over 1.0.0 m ties of wator,, recycled water, and sewer maktris; 38-water/Tecycled <br />water pump stations; and 1 8-welthead facilities. He will be the f000lpoint for.00mmmirilcations <br />between the 01ty and mombers of the project team to ensure that the project needeare clearly <br />spelled out and understood. Mr. Epperson will be responalble,for achlaVlyto tho City's goals and <br />ensuring Compliance with project (ntet% completeness of the final dollverables, and satisfaction <br />of the City, <br />MK.Eppo�rson has been workino with the City $trice 1903. While his knowledge, of City facilities <br />and working relationship with the City staff started In 1983, Mr. Epperson 16 outtontly the Project <br />Manager for the doslg� 61 the Well No, 32 Rehabilitation Project as wall as over 90 past projects <br />under the City's On -Gall Water Engineering Design Services Oontraot$ since 2006. Mr, Epperson <br />has a long peraontil history of wofkIrfU with tho City and Is very proud of the repeat service -He <br />believes strongly that repeat work Is earned through responsiveness, hard work, and providiho a <br />quality Product. In addition, Mr. Epperson was the Project Manager an the three sirrillar projects <br />Included In the relevant project experience section of the proposal. <br />Key Senior Staff <br />A cornerstone to our continued success Is the Involvement of key senior staff during the design. <br />Mr. Mark Bush, PE,, will serve as the team's QAJQC Manager. Our team clearly understands the <br />importance of making certain the City receives the highest quality product from Tetra Tech. We <br />have assigned Mr, Bush to lead the 0A1QC review team for this project, and strictly monitor the <br />project's engineering and construction components. As QA/QC Manager, It will be Mr. Busws <br />responsibility to assign and oversee QA/QC for each phase of the project to ensure that all of the <br />project goals are met. Mr. Bush Is also very familiar with the City, <br />Mr. Mike Tool, PE, will be the Design Lead for the well. Mr. Toot has ovel, 94 yearsof <br />experience and has been working with Mr, Epperson on various projects for over 20 years. Over <br />his career, Mr. Tool has designed over 20 pump station% lift stations and well facilities. During <br />the last 10 years, Mr. Too! has been working almost exclusively with Mr, Epperson on our pump <br />station and well projects. Mr. Tsol understands the design and construction aspects of a well. <br />Mr. Tool will utilize his experience to work with the team's hydrogeologlet and work through all of <br />the layout Issues for the construction equipment required to construct and rehabilitate the well in <br />the future. Mr. Tsol has been the Project Engineer f or the following well equipping projects: Mid <br />Basin Centennial Park for OCWD; Well No. 27 for City of Orange; Rehabilltatlon of Well Nos. <br />I 15, 107 and 78 and all of the IDP potable/nori-potable wells for IRWD, <br />011yof5anteAna .4- TETRA TECH <br />25E-1 69 <br />C <br />co <br />G <br />0 <br />0 <br />CP <br />Y <br />. 0 <br />�64 <br />CJ� <br />
The URL can be used to link to this page
Your browser does not support the video tag.