My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />ON -CALL ENGINEERING GERVICES <br />Wafer Refioum.-Opw A <br />Hydrogoologloal Services: Geotechnioal 4terVICOP.- <br />RIchard.0. Slade & Associates LLC Leighton Consulting, Inc. <br />soryey: traftlo Control. Potholing: <br />Metz.Survoying PWA6soclatos Qardno, $af.r-DIg or 0-Salow <br />Tetra Tech has worked with all of the above consultants for several years, <br />Summary of Staff Oualificationsand Experience <br />Tetra Tech has selected highly quallflordl Individuals -with fttask4o-talont match to meet tile <br />needs of the project. Tile table below outlines the experience, tIms.coMmItment, and home <br />office of each team member, Resumes of eaelflnOlvidual 94LIn,bp ifound.In the Apparick. <br />Resumes.,sedtlon of this proposal, <br />Tom. Eppomorl, Pr: <br />Project Manager <br />Mark bush PE <br />QA1QC <br />Mike Tsol' PE <br />Wall/Plpellne Design <br />Lead <br />Kyle Bohn PE <br />a W011 NO. 32 HOW <br />0CW0 Mid Basin I <br />South Gat a W4 No. N <br />Irvina 35 V% <br />1 - Orange Wall No. 27 <br />t - JRWD Wells <br />it fthta Ana Proldpts <br />Wine 1 <br />Irvine 24 <br />Irving 10 <br />Victor Ramirez, PE, I San <br />SE Dimas I <br />Structural Lead I I <br />RE <br />7 60/p ... <br />13 20% <br />7 <br />4 25% <br />:Orange Well No, 27 <br />jiti A si <br />�q. P FqJqqt <br />Well No. 32 Rehab <br />OCWD Mid Basin <br />Orange Well No. 27 <br />IRWD Wells <br />WiUROK-32 <br />0CWD Mid- Basin <br />Sailt4'Aila Project <br />Orange Well No. 27 <br />a <br />' 16 ' <br />, <br />Well <br />No. 32 Rehab <br />- <br />00WD Mid Basin <br />South Gate Well No. 29 <br />Orange Well No. 27 <br />IRWD Wells <br />Paramount WAII NO, 1A <br />Well Q. <br />Ozon Mesa' V, PE 00 W. D� 'Mid I BE 916 <br />[Nine 25 3 260% e 860th,0 -6 <br />,so _Aie:WeIIN6.2 <br />r�,'h 0 Wa, <br />lot onp� 0 �g 11 No� V <br />Tetra Tech, and more Importantly, the team dedicated to this project, has demonstrated a track <br />record In delivering Identical services to water agencies in Southern California, This project <br />displays many similar elements to several past projects Involving rehabilitation of existing wells. <br />We believe our references are our best demonstration of the successful pertnerIng and <br />completion of these projects, We Invite the City to call our references listed In this proposal. <br />City of Santa Ana <br />.6- <br />25E-1 71 <br />TETRA TECH <br />G <br />el <br />01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.