Laserfiche WebLink
ON -CALL ENGINEERING SERVICES <br />distribution system may require piping modifications to allow for the Initial well discharge to <br />waste of to the reservoir and not to the distribution system. <br />Pipeline i0esign <br />Tetra Techs previous experience will help the Pity to,suooessfully addressihe key pipallne <br />Issues Including: agency requirements, utilities, traffic control, alignment selection, and <br />construction phasing, Early on In the project, It will be Important to meet VAth the City Public <br />Works to define the following requirements: work hours, lane closures, Storage. of equIpment; <br />open put verses boring of Interseotlons; trench backfill; and pavement restoration, <br />Tetra Tech will.perform our utility research Immediately upon Issuance of the Noticeto-Proceed. <br />The USA moiddings lot the gootechnical Investigation will Also be used to verify Vie location of <br />existing utilities. Any pothollng services will be completed by use of the vacuum extraction <br />method thereby min . ItnIzing pavement daffls�oe and traffla.disruption. In adation, a field walk Will <br />be completed to. look for evidence of Infrastructure (ip.g, valve -can$, trench patch, vaults, etc,) as <br />sorrie utility owners do not belong to USA Dg Alert, and others respond . withr-Only Part I IQ1IV <br />'complete Information. We have learned%the importance of taking extra -steps to verity potential <br />underground Iriffeattudturies, <br />The proposed Pipelines In thaarkmp(a project are staJed to be locattod within on arterial Street. <br />Therefo re, traffic control will be a major concern ofthe City. The traffic Control requirements <br />shali be determined with the objeGtIvopt providing the Contractor with adequate room for safety <br />as woll.as efficient operation while providing the least possible disruption to the traveling public. <br />We believe traffic control is a key design eiement and should be completed hand-firi-hand with <br />the design of the pipeline. Similar to $A-15 Vault Relocation and San Lorenzo Lift Station <br />projects, both have pip,611nes, being constructed Within. Bristol Street, Tetra Tech will prepare the <br />conceptual traffic control requirements, specifying the work area and proposed, lane closures <br />that are acceptable to the City, The contractor will be responsible for the,actual piroparation of <br />the tiiffjo control plans basied oil these re�Ulreiments. <br />If the proposed pipelines cress a signalized Intersection, Tetra Tech will evaluate whether a <br />bore and Jack Operation or open�cut construction wit be the most beneficial solution. Typically, <br />Tetra Tech has been able to show that oponwcut construction during limited work hours top during <br />times of minimal traffic Is the better solution verses bore and Jack operations due to the 4�4 <br />hours., 7 day lane closures required for the plts. <br />Proloot Management <br />Over the years, Tetra Tech has established well defined, rigorous procedures for project <br />management. These techniques have been developed and refined and have contributed to our <br />success and reputation. The keys to our project management system pro communications, <br />project planning, monitoring, and quality assurance. The Tetra Tech team's goal Is to keep the <br />City staff "in the loop" from day one of the project. Communication tools Include formal progress <br />reports afforded through our project management system and an Informal give-and-take <br />approach starting with Tom Epperson, our Project Manager, and extending to Every member of <br />the Tetra Tech tearn, At the project's outset, the chain of command and appropriate <br />communloation.rhathods will be agreed upon and can be as formal or as Informal as the City <br />desires. We will use the entire communication spectrum, We will conduct formal meetings with <br />agenda and typewritten notes, and we will use Informal meetings with noted to file, We also will <br />have documentation of telephone communications, with notes to f Ile or letters of understanding <br />as appropriate follow-up. <br />CftyalftniaAna -ii. TETRA TECH <br />25E-1 76 <br />