Laserfiche WebLink
ON -CALL ENGINEERING SERVICES <br />Maw newms— OpIkin A <br />copy Will be submitted to the City'for review. We envision the construction drawings will Include <br />the following: <br /># General Sheets (Title Sheet and General'Notes Sheet) <br />* Horizontal Control Plan <br /># Exisfing Well Slid Plan and Existing Well Mechanical Plan and Section (2 iheets� <br /># Existing Well Detail end Well Rehabilitation Plan <br />o Well Yard Piping Plan and Profiles (2, sheets) <br />* Wolf Discharge Pipeline Plan and Priollie (9 sheets 0 40 scale) <br />, Well Sewer Pipeline Plan and.Proffle (1 sheet 0 40 s.cato.) <br />* Trench and Paving Details, Piping -and Miscellaneous Detalls �2 shoots) <br />o Connection Details (discharge piping and Sewer) <br />* Wall Elaciftel Site Plan and W.01 �Iootrlcsl Modifications (2 Shoots) <br />The following are additional Construction drowIngs for Optional Work: <br />Modification Ig Well F.IusblW Pigihg (OPTIONAL TASK) <br />* WeIfFlushing Piping I Modification$ Plan and Sections <br />A On-slte Piplaq,Modifications and Connections <br />Adding Sodium Hypoahlorite Faclilliev.(OPT)ONAL TASKV <br />0 Sodium Hypoohlorlte Generation Sohem$016 and DOtalig <br />4 Sodium Hypoohlor(to Mechanical Piping Plan And Sections <br />* Sodium Hypophlodis Sulking Structural Plans (2 shoots) <br />* Structural Details <br />* ExIsting Well Site Electrical Plan and Single Line Diagram <br />* Sodium Hypoohlorlts Building Power and LighV.6f; Plan <br /># Sodium Hypochlorite PWD <br />s Well Loop Diagram Vpgrade <br />* Well PLO Modifications <br /># Well P&tD'Upgrade <br />T�affk; QgnjLq1 Plang (alte-speolf[c) (OPTIONAL TA81<1 <br /># Traffic Control Plans for Potholtng (3 sheets) <br />0 Traffic Control Plans for Geotechnioal Investigation (2 sheets) <br /># Traffic Control Plans for Pipeline Construction (3 sheets) <br />Task 8: PLO Panel Design and Control 6trategles - This task Is an Optional Task it the City <br />decides to revise, upgrade, or modify the PLC, panel design and the well control strategies. The <br />following Is a brief Summary of the Optional Scope of work: <br />• Review and update/revise the Functional Specification provided by the City, <br />• Modify control panel per City's now standard control panel drawings and specifications, <br />• Prepare wiring diagrams, loop diagrams and control panel drawings. <br />Ofty of Santa Ana .15. TETRA TECH <br />25E-1 80 <br />