My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON -CALL ENGINEERINQ SEAVICEt <br />Task9: 100% Construction Document (PS&E) 8momitfal - Tetra Tech wfll prepare the 100%, <br />PSAE'o In accordance with the approved Basis of Design Report, compile in a matrix format all <br />60% commahts. rooelv6d, andaddreas and Incorporate comments per the matdx. Two (2) hard <br />coplos,of full size plan setsj four (4) hard copies of half-91,"a plan sets -and one electronic pd,1 <br />copy will be submitted to the City for.revlow, <br />TaskIO: Final Construction DocumernfPS&E) Submiltial -Tstra Tech will prepare the final <br />PUE's ready for bidding, compile In a matrix format all 100% comments received, and address <br />and Incorporate comments per the mptrix. TWP (2) hardroples of full size plan sets, four .(4) <br />hard copies of half-size plan -sets andonsoledtionle pidf copy will be submitted to the City for <br />revlaw� <br />Taokft Didding.and Construction Phase Services - Throughout the bidtflrig and <br />c6nstruOtiOri prooets, Tetra Tech will assist the City in the following Items: <br />Attend tho pre�oortgtruotlon meeting and construction kJok-off meoflng� <br />Assist in responding to questions raised durthV the bidding process, <br />Prepare at maximum two (2) addentlums. <br />Respond In' Writing to. cointroator`6 questions (NFIs) during construction, We have assumed a <br />total of fifteen (15), of which f Iva (5) will require design sketches or exhibits. <br />Attend alto Vlsft4 to clarify design Issues. Assumed eight (8) hours for site visits and <br />WhAth.10tion meetings, <br />Assist the City with start-up of the well, We have assumed eight (8) hours. <br />Revlowshop.,deaWlhp. We have assumod twenty (20) shop drawings. <br />Evaluate and respond to contractors requests for change orders. Assumed three (3). <br />Task1g: Record Drawings Preparation -Tatra Tech will prepare record drawings based on <br />the final as -built drawings provided by the contractor and/or City. We will submit one (1) full size <br />hard copy of the Record Drawings along with one, (1) electronic copy in MicroStation fort -hat, <br />Additional Work (0 - PTIONALI: <br />1 . Modifications to Well Flushing Piping <br />2, Adding Sodium Hypochlorlto Facilities <br />3. Well Operation Modifications (directly Into distribution system) <br />4. Site Specific Traffic Control Plans <br />5, PLO Panel Design and Strategies <br />6. Field Monitoring of the Well Rehabilitation Construction <br />City of Sanin Ann .16. TETRA TECH <br />25E-4 81 <br />P <br />G <br />0 <br />01 <br />CP I <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />01 <br />3 <br />:J <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.