Laserfiche WebLink
TETRATECH Mark W. Bush,, PE <br />OAtQC <br />badkwo0h recirculation pumps, sludge mixer pumps, sodium hypoohlorite and arnmento <br />treatment systems, and an emergency generator. The facility Included the. following <br />building/briclosures: well building removable sound enclosure; prs�englnqered, prefooricated <br />precast concrete electrical building; and prefabricated fiberglass Insulated building for.the <br />Wckwash pump orfolosure, <br />Irvine D.issalteirProject Potable #Ad Non -Potable Well Drilling slid Equipping, trOne Ronell <br />Water.01stria, tinrins, CA — Project Engineer for the preparation of plansand specifications for <br />the , drilling and equipping of design of well dilillirig for five pota�lo water wells and onerlon- <br />potsible water well, This Included wellhead equipping for each Well for both oboveground and <br />WoworoqnO, faciliffe% Also Included In this propOt �ere rnodifications to. a <br />n existing nonopqtabla <br />water Wall, <br />Well Noi 34 Modifications,, City of Santa Ana, Santa Ana, CA— Design Engineer for the well <br />M00106tibra Which Included the addition of a new pump and motor. <br />John Qsr <br />rthq.RosqrV*Jr improvements, Phase 11, City of Santa Ana, CA — The Phase 11 <br />Impri5vorneints holoded the demolition. of a 5 MG Ourille reservoir, WHO ngs and a pump station <br />and the construction of two new 6 MG circular prestressed concrete reservoirs, drilling, and <br />eouippirig of Wall No. $0, a now potable well (1,35G.foot deep),, insfallation of three sodium <br />hypoohloflte disinfection facilities, and site landscaping Improvements. <br />Centennial Parl; Neighborhood Water Main Improvements, City ofsanta Ana, Santo Ana, <br />CA — Project Manager for approximately 20,OOD linear feet of 8-Incb PVC water main to replace <br />existing Water mains, <br />Contra 1 City Water Main improvements, City of Santa Ana, Santa An*,., CA � Project <br />Manager for approximately 6,600 linear feet of Vnch PVC water main to replace existing water <br />mains. <br />Plco�Lvwelll Neighborhood Water Main Improvements, City of Santa Ana, Santo Ana, CA — <br />Project Manager for approximately 0,2001inear feet of 8- and-12-inch PVC water main to replace <br />existing water mains. <br />Mid City Neighborhood Water Main Replacement Project, City of Santa Ana, Santo Anti, <br />CA — Project Engineer forapproximately 9,000 linear feet of 12- and Q-tnch PVC water main to <br />replace existing water mains. Project included the hot tap of two existing water mains and 16 CLO <br />In connections. <br />Bristol Street Widening Water Main Replacement Project, City of Santa Ana, Santa Ana, <br />CA — Project Manager for approximately 6,000 linear feet of 12- and Unch PVC water main to <br />replace existing water mains. <br />Page 2 <br />C) <br />0 <br />0 <br />0 <br />0 <br />N . z <br />25E-1 96 <br />