TETRATECH Michael Tsol, PE
<br />Well Equipping Lead
<br />Mr; Tzol hog over 24 years of professional operlenco. in water,
<br />Ed4catloo:
<br />wastewater, and recycled water f-rigilfteering, Mr, Toot has.beQn
<br />University of California, Irvine
<br />responsible for the.planning and design of water, wastewater, and
<br />B.S. Civil Enginq6ting, 1991
<br />recycled water p1pellnes @long with pump station'si flow control
<br />Registratiorre/cOrtiflostlorls:
<br />'facilities, reservoirs and sits Improvements. He Is knowledgeable
<br />iftgiskireO: ProlessloW
<br />in the use of the latest computer software includl n9CADO,
<br />Engineer
<br />horlontol controi, hydrology, hydraulics and various spreadsheet
<br />California No. 63718
<br />programs.
<br />AffillAVonv
<br />]EXPERIENCE
<br />American Society of Civil
<br />EngIneers
<br />Mid-Sasin4rijectlon; Centent'llal
<br />Orange County Walter District, $arjto AA4,,CA— DAzignoffour
<br />Offloo:
<br />Injection Wells to be Iodated within Centennial Park.1h the City of
<br />Irvins, Caftnito
<br />So* Ana for Orange County Water District. In addition to the
<br />Yeara of Experience,
<br />engineering sarvkos for the four Injeotion w.6110, the project
<br />24
<br />Includes the design of the supply pipeline, backftush pipeline,
<br />bridge crossing, two shared facility sites, a monitoring well site,
<br />Years wlib Tetra Tech:
<br />site ImOf6vethent6, And paving of park Access roWs and parking
<br />24
<br />Well 27 EquIpping Pion, City of Orange, Otarge, CA — Project
<br />Engineer for the preparation of the plans, specifications and cost
<br />estimate for theequIpping of a potable water well, As part of the
<br />well equipping a generator room was Installed for backup power,
<br />Plant 13 So. color Station Rehabilitation and Well 22 Improvements, City of Lakewood,
<br />Lakewood, CA — Project Engineer for plans, specifications and cost estimate for the
<br />replacement of a 4,800 Opm booster pump station and replacement of a 1,200 gpm well pump.
<br />In addition to the booster pump station replacement, the construction was phased so the
<br />booster station was operational during Construction.
<br />Well 106 Well Siting Study, Irvine Rainch Water District, Irvine, CA — Project Engineer for a
<br />study to determine the location of replacement Well I 0G.Several locations were evaluated to
<br />determine If drilling was feasible along with connection to the rest of the raw water system.
<br />Well I - 07 Replacement, Irvine Ranch Water District, Irvine, CA — Project Engineer for the
<br />preparation of the plans, specifications, cost eatimate and construction services for the drilling
<br />and equipping ofa potable water well In the City of Irvine. This project combined the well drilling
<br />and well equipping phases of the project together,
<br />Well 70 Replacement, Irvine Ranch Water District, Irvino, CA — Project Engineer for the
<br />drilling and equipping of a recycled water well In the City of Irvine. This project,included
<br />construction of the well within a highly visible area with limited work space,
<br />Irvine Desalter Project Potable and Non-Potoble Well Drilling and Equipping, Irving Ranch
<br />Water District, Irvine, CA — Project Engineer for the preparation of plans and specifications for
<br />the drilling and equipping for design of Well drilling for five potable water wells and one non -
<br />Page I