My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NTETRATECH <br />Michael Tsol, Pr: <br />Well Equipping Lead <br />potabJe water wall. This includes Wellhead equipping for each well for both aboveground and. <br />balowground facilities. Also Included Jn this project was the. modification to an existing rion- <br />p6toble water Wail, <br />Lakewood Wells 28 and 29, City. of Lakewood,. Lakewood, CA — The City.of Lakewood is <br />constructing one new water well expected.to produpe about 3,000 9pm (We1128) and possMy a <br />seooiid well (Well 20) toprevii:le additional groundwater to supiplement the Ott '" water supply <br />source.'The City Would pump water frorn the now well facllltia�s tO one of the existing w4rvoirs.. <br />MOW treatment be needed for Iron, manganese or arsenic removal from the pow water <br />source, the treatment facilities would likely be located. at the reservoir site. The project consists <br />of preparing R Wall siting study end providing recommendations for the ne* Well siles. In <br />odditl n, a drinking Water source, assessment wag prepared and submitted to the Health <br />Department for the now well, A well design fisport was prepared that JhdOrj*StSdJhO deslan <br />plans and te.chnfoal.,specifloations. The project Is scheduled to bid In'late 2014 with completion <br />of Well 28 oonstructl6n In 2016, Field observatlort du4va well &fIll Ing and construction Is also <br />planneO'as part offfie scope of work. <br />Well 115 Replacement, Irvine Ranch Water DistrIld, Irvine, CA- Project Enolheer for the <br />drilling endaquJipping of a potable water well in the'City of Irvine. This project aombined.tha, well <br />,drilling, and weJ[ equipping phases of the project together. Coordination with the City of Irvine <br />and The Irvine Company were required to procure the land for the Wail site. <br />Pap 2 <br />25E-1 98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.