Laserfiche WebLink
NTIETRATECH <br />Victor M. Rarniroz, PE, SE <br />$tructural Lead <br />Mrk Ramirez has over 30 years of structural engineering design Education: <br />eXperlenoe with special emphasis in the design of water B.S., Civil Engineering, <br />StOragalwater containment and water conveyancis related 0611fornia State Univ rft <br />structures, This Includes reservoirs, watodwestalwatfir treatment Los Angeles',. 1906 <br />plants, booster pump stations, flow control facilities, pressure Registrations/Vortificfations: <br />reducing stations and pipelines. His experience also includes the <br />design of a wide variety of other Jype$r of Structures, inof Registered Strucloral <br />uding Engineer <br />boildin s, bridges and storm.drairage related structurss,,H6 Is Callifornia,2064,Nm 4720 <br />thor6ulhly knowledgeable in all types of construction, 'Including <br />reinto.rPeO conor0e, masonry, ptrucipral steal,arl timber, Re laisred Civil Engineer <br />EXPERIENCE Professional Affiliations: <br />Mid-Saalin Injection: Centennial ParkrDesign Servicos, Orange Structural Engineers <br />County Water District, Santa Ana, CA — Structural 9r4ject Association of Southern <br />Man-090 responsible flit the. design of four Injection wells to be California <br />located within Centennial Park. In the City of SantaAna for orange American Institute of Steel <br />County Water blatrict. In addition to the engineering services for Construction <br />thefout INatimn Wall% the project Includesthe desigin of the <br />supply pipeline, back.flush pipeline, bridge crossing, two shared, Field Safety Certifications <br />facility 00% a mord ng "I[ site, sh Improvom Confined Space <br />to(, . ants, and paving Fall protection <br />Of park aocess roads arid parking lots. Office: <br />DesIgn-BuIld of Wells �21 and 22 Despiter, Irvine Water <br />District, IrvIno,,0A — Structural Project Engineer for a projer San Dimas, California <br />t that <br />is the thled. membrane watiatteostmerIt plant completed by the Years of Experience: <br />design/build team of Tatra Tech and Pascal & Lpdwig. The main 30 <br />treatment facility Is housed In a 10,000 square foot tirt-up, concrete <br />building which also contains pump, control, HVAG and electrical Years with Tatra Tech: <br />roorns. A comer of the building Is constructed on a 12 foot deep, 36 <br />100,000 gallon, buried, cast-in-placo concrete water storage <br />structure. Special consideration Was given in the analysis and <br />detailing of the tiltrup building and buried concrete structure so <br />that all design forces are properly resisted slid the potential <br />differential settlement between the shallow building foundations and the deep water storage <br />structure Is mitigated. Various concrete and steel structures for pro- and pDst-treatment areas <br />are also located on the site. These areas are hidden from public view by 27 foot tall freestanding <br />flit -up concrete screen walls and by the maln treatment building Itself, <br />Burris Pump Station, Orange County WaterDletrict (OCWD), Anaheim, CA — Structural <br />Engineer for the replacement of an existing pumping facillty at the Burris Pump Station location. <br />Mr. Ramirez was Involved In the comprehensive design of the 0.8 MG buried circular wet well, <br />The new facility will allow OCWD to transfer up to 200 cubic feet per seopridfrom the Santa Ana <br />River, which will beand utilized for groundwater recharge to the Santlago Basins. <br />Wells No. 40 and 44, City of Ontario, CA — Project consisted of two new domestic water wells <br />approximately 1,200 feet deep. Well capacities are,2,000 to 3,000 gpm. Included masonry block <br />enclosure with open roof courtyard. Also included disinfection and constructiom administration, <br />Page i <br />25E-203 <br />