|
NTETRATECH Victor M. Ramirm, PE, SE
<br />Structural Lead
<br />Well 107 Replacement Irvine Ranch Water District Irvine, CA — Structural Project Manager
<br />for the Well 107 site. The structures Include concrete masonry retaining walls, concrete mat
<br />found.g.itlons for electrical cabinets, concrete wellhead pedestals and pipe supports.
<br />Wall 78 Replacement, Irvine Ranch Water District, Irvine, CA — Structural Project Manager
<br />for a buried reinforced Cohicrate Well vault. The vautt Is dosigned for the soll loading and H-,20
<br />truck loading with applicable Impact factors, The concrete wellhead pedestal is Isolated from the
<br />vault structure to allow for diffeferiffall ietilement of the vault relative to the wellhead, without
<br />causing damage to the vault or wellhead. .
<br />Ing Of Wells 1-10, 1-17, and 1-18, Chino Basin DAsialter Aothorltyx Chinof CA — Tetra
<br />providing design and construction e6gIneoring servIces for the equipping of three now
<br />wells, at three separate allies. Thowope of the structural design Includeaftfindatlofts for
<br />prafabricated.ele , arlooll erictotu ms, surge tank, welf pedestals, pipe rocks and supports.
<br />Services Inclu ,ptual design, parmittft assistance, fif s
<br />do porica nal id Ign, W assistance, and
<br />construction Of'ssistan Co.
<br />Wolf C-5, City of Cerritos, CA — Mr, RamlirexseNiad as Structural Project Engineorfor this.
<br />2,000 square foot well building on a mpt�fbundlstlpn, to mitigate the effects of p4t6atal
<br />liquefaction. The facility ties nine separate rooms for housing mechanical, electrical, disinfection
<br />end water conditioning equipment, The building also contains room$ for an emergency
<br />generator and HVAC�equlpment as Wall as office and restroom spaces. Portions of the walls
<br />and roof at the well -are removable. The structural design work scope also Included arphiteotural
<br />services for making the well building match the buildings in the adjacent housing development,
<br />We!I-No. 27 Treatment Plant, Lakewt000, CA.— Design andponstruction phase so rvices for a
<br />groundwater treatment facility whio. h Includes foundations for filter vessel, storage tanks, and
<br />pumpIng equipment, The design also Includes the structural and architectural design of a 10
<br />loot high masonry screen wall which mirrors several of the architectural features which occur In
<br />the community that surrounds the plant.
<br />Rancho Del Ray Wellhead Treatment Factlityo Otay Water bistrict Chula Vista, CA —
<br />Project Structural Engineer for the design of a 5100 square foot masonry building, with 0 steel
<br />trus$ framed roof, which houses a well head, RO treatment facility, disinfection equipment,
<br />conventionally reinforced concrete clearwall pump station, control room, office and storage area,
<br />The design of the building balances the functional water production requirements with the
<br />aesthetic, architectural design of the exterior of the building, which was critical for compliance
<br />with local planning agency requirements.
<br />Irvine Dosalter Project, Irvine Ranch Water District, Irvine, CA —Structural Project Engineer
<br />for a project which Includes a 6,000 square foot tilt -up concrete RO filtration building, several
<br />partially buried cast-Irt-place concrete clearwell pump stations, a buried cast -In -place concrete
<br />well vault, 270 llnear feet of 26 foot high tilt -up concrete free-standing fence wall and several
<br />chemical containment areas with steel framed canopies,
<br />Pege 2
<br />25E-204
<br />
|