|
NTETRATECH
<br />Man Hong (Eric) Yuen, PE, SE
<br />Structural Design
<br />Mr. Yuen has ever eight years of experience In the design,
<br />Education:
<br />analysis and detailing In sirpotoral engineering, He is
<br />B.S�, Civil Engl4aerina,
<br />kinowledoeable In reinforced concrete, . masonry, structural steel
<br />California State Pollylachinlo
<br />and wood frame design, and construction for a variety of building
<br />University, POM010. 2007
<br />and Infrastructure projeetshlolvding reservoirs, water/w0atewater
<br />treatment facilities, as well as sesm10 retrofit. of existing
<br />professional, Engineor, Colfiernia
<br />,atructures.
<br />2000, No. 7SMS
<br />EXPERIENCE
<br />structurol Engineer, Callfbinle
<br />2044, No. 6177
<br />Equipping Of Wells 1-16, 1.17, and 1.16, ChIno.8asin Destalter
<br />Cal OES Ulety Assessment
<br />Aluitkokity, Chino, CA —'rotrm Tech is providing design and
<br />Prporaw Evaluato�T.tslniny
<br />construction engineering si,#rvicos for the equipping of three now
<br />ProNhWcmal Affillatildft
<br />wells at three separate silles, The scope of the structural design
<br />Am"an Institute of Steel
<br />includes foundations (or prefabricated electrical artclosuros, surge
<br />Co,"Amotion
<br />tal1k, Will pedestals, And supports. Service$ Include
<br />conceptual design, permitting assistance, final design, bid
<br />Field Safety Certifications.,
<br />assistance, and ronstruation assistance. Mr. Yuen ibrOd'ar. the.
<br />Fall fteteetion (ILAdlm;
<br />structural designer On this project.
<br />Scaffolding, Aerial 1.111%)
<br />Design -Build of - Welts 21 and 12 Dosaltar, Irvino Water
<br />MOM
<br />Distildt Irvine, CA � Mr. Yuen served as Structural Design
<br />H23 protection Training
<br />Engineer for this design -build project. This project is a membrane
<br />Respiratory Protection Training
<br />water treatment plant that consists of a buried rectangular
<br />Confined Space Training
<br />concrete wet weli, a concrete tilt -up process building and,
<br />(1a015)
<br />numerous concrete mat foundations, Pascal & Ludwig Is our
<br />Qffice:
<br />Design -Build Partnerand Also the prime contractor on the project.
<br />San Dimas, California
<br />Tetra Tech will work under Pascal & Ludwig through a
<br />subcontractor agreement.
<br />Years of Experience:
<br />Eight
<br />Rancho Del Ray Wellhead Treatment Facifity, Otsy Water
<br />District Chula Vista, (�A — Mr, Yuen served as Structural Design Years with Tetra Tech;
<br />Engineer for the design of a 6,100 square foot masonry building, Eight
<br />with at sisal truss framed roof, which houses a well head, RO
<br />treatment facility, disinfection equipment, conventionally
<br />reinforced concrete clearwell pump station, control room, office
<br />and storage area. The design of the building balances the functional water production
<br />requirements with the aesthetic, architectural design of the exterior of the building, which was
<br />critical for compliance with local planning agency requirements.
<br />Burris Pump Station, Orange County Water District (O!GWD), Anaheim, CA — Design
<br />Engineer for the replacement of an existing pumping facility at the Burrls Pump Station location.
<br />Mr. Yuen was Involved in the comprehensive design of the 0.8 MG buried circular wet well. The
<br />new facility Will allow OCWD to transfer tip to 200 cubic feet per second from the Santa An&
<br />River, which will be and utilized for groundwater recharge to the Santiago Satins. Mr. Yuen also
<br />reviews shop drawings and responds to RFIs during the ongoing construction phase of this
<br />pro]W,
<br />Page I
<br />25E-205
<br />
|