|
NTETRATECH
<br />Mazen Kassar, PE
<br />rlectritallinstrumentation Lead
<br />Mr, Mazerf Kassar has more than 27 years of experience In
<br />Education:
<br />electrical ang1heering and Industry standard that Include electrical
<br />0,S., Electrical Engineering,
<br />engineering staff management, project management, oonst . ruot . ion
<br />C01116MIS State U61VOrdtY, Long
<br />mAn"ement and supervision, water andwasewater treatment,
<br />petro-chamloal design, and anVIronmentalsoll and groundwalto.r
<br />r
<br />Roglatrations/Certifioations:
<br />treatment, Hilabs Q k9rovn8 Includes designing medium and low
<br />Prol'obtilonel Mectrioal Engineer,
<br />voltage power distribution, designing Instrumentation, control
<br />C41116MIal 10K No, J§sDR
<br />.systems and SCADA systems for It wide -variety of projects, and
<br />General Construction, Class 9
<br />the Installation of alearicAl systems for remedi0tob projects',
<br />Caffornia, 2000, No. 77?W
<br />Including soil vapor extraction systems and groundwater pump4
<br />and -treat systems, Otherexparlanc.e. includes, working With utility
<br />Contractor - C-1 0 Electrical,
<br />California Class 6 , specialty
<br />companies to provide now electrical service to now projects,
<br />2000, No. 77,7844
<br />Working with local Building and Slirfet Departments to obtalff Plan
<br />Check, and construction permits, fialyttouble shooting of electrical
<br />Training and CartificatJohat
<br />And meolhanicalsystema; system commissioning arid startup,
<br />ETAO Eleotrl�ciir Power Modeling
<br />problem solving, and managing an operation and maintenance
<br />Project Management 1 & it
<br />clepartment, He has strong knowle ge in MS Offic an
<br />e
<br />Auto CAD 2005
<br />AtifoOAD,
<br />GE and Allen Rhadley PLC
<br />EXPERIENCE
<br />programming
<br />Mid -Basin Injection: Centennial Park Design Services,
<br />GE11htellution and Wonderware
<br />SCADA programming
<br />Orange County Water District, Sante Ana, CA — Electrical F
<br />Vapor Mextractlon and
<br />responsible for the design of four Injection wells to be located
<br />Grouridwater Treatment
<br />within Centennial Park inthe City of Santa Ana for Orange County
<br />Water District, In addition to the engineering services for the four
<br />OSHA il-hour Hazardous Waste
<br />Operations Annual Refresher
<br />Injection wells, the project Includes the design of the supply
<br />Training, 2016
<br />pipeline, baokfiush pipeline, bridge crossing, two shared facility
<br />0%, a monitoring well site, site Improvements,, and paving of
<br />OSHA 11-hour Hazardous Waste
<br />park access roads and parking lots,
<br />Operations Site Supervisor
<br />Training, 1992
<br />Lakewood Plant 13 Project Lakewood, CA — Managing the
<br />OSHA 4D-hour Hazadout
<br />electrical design for Plant 13 pump station upgrade, The design
<br />Waste Operstions Training,
<br />consists of replacing the plant old MCC with now outdoor NEMA
<br />198D
<br />3R MCC, installing how conduits and wires to the new pumps,
<br />Professional Affiliations:
<br />and reinstalling the existing control and telemetry systerri, This
<br />Institute of Electrical and
<br />replacement upgrade requires Interfacing with Southern California
<br />Electronics Engineers IEEE
<br />Edison (SCE) �and relocating the existing AT$.
<br />Well 27 Equipping Plan, City of Orange, Orange, CA —
<br />Office:
<br />Irvine, California
<br />Electrical Project Manager for the preparation of the plans,
<br />specifications and cost estimate for the equipping of a potable
<br />Years of Experience:
<br />water well. As part of the well equipping a generator room was
<br />27
<br />Installed for backup power,
<br />Years with Tetra Toch:
<br />Lakewood Well No. 22 Project; Lakewood, CA — Managing the
<br />Eight
<br />electrical design for well no, 22 purnp upgrade, The design
<br />consists of replacing. the old well pump VF0 with now one and
<br />rewiring the new well pump.
<br />Page I
<br />25E-207
<br />
|