Laserfiche WebLink
G <br />G <br />TETRATECH Mazen Kassar, PE <br />Elettrical/instrurnentation Load <br />0 <br />City of Paramount, Well 13 & 14, Paramount, CA — Managed Instrumentation and control <br />design for Well 13 and Well 14 chlorination system. The design Included providing new PI-C <br />system to control chlorine and ammonia metering pumps. Provided P&ID, loop diagram, wiring <br />schematic and.lhstrumentation andoontrol plans, <br />Well 21922 aesaltor Plant, Irvine Rench Water District, Irvino$ CA — Wello 21 and 22 <br />Reverse Osmosis (RO) Tresljrnept Plant Is.designed to remove1ollds ifrom well water and <br />Water source. The design consisted of providing all design -wild servIcesto <br />01 <br />=101t,301110111fly, operational reverse osmosis water treatment Plant including, but not limited to. <br />Protrileotmaht. chemical systems, high pressure feed pumps, reverse osmosis treatment trains, <br />membrane clean4ri-place system, decatbonatorg, post treatment chemical systems, supip-rvioary <br />control and data acquWtion, product water pump station, treatment plant building shtlelectrIoal <br />arid instrumentation system. The RO Plant was sized to produce 6.27 mgd.6f water, Water will <br />N treated to ran I el , dow <br />. . love as, is (Tl)�) and nitrates. Managed the e6dtd I deal n of the W <br />power od control system, preparing technical specifications, preparing engineer's cost <br />, <br />estimate, preforming electrical power system Mudlesthoit Iftolu ad I� ad flow, stior t circuit and <br />aro flash calculations, and integration with.the city's SCADA system. <br />'Electrical. <br />Loma Linda UnIveralty.Affilers6n No. 4 Well, Loma Linda, CA — Engineer <br />responsible for creating electripal plans, specifications, electrical load schedules, panel <br />schedules, condui I t, and Wire sizing, electrical d0sits, emergency standby generator $Jzing, <br />P.reation of pump control schematics� drafting technical spoOotion% and preforming electrical <br />power system studies that Included load flow, short circuit, and are flash calculations. The <br />project design Indludes providing a now pump, a now PLO. system to control waft pump and <br />providlog lighting system. <br />Crooke Reservoir Electrical Upgrade, City of Santa Ana, Santa Ana, CA — Electeloal <br />Engineer for the design of the replacement of the existing motor control panels and <br />switchboards for Crooke Reservoir pump station, Well 27 and Well 26. <br />Surris Pump -Station, Orange County Water District,.F6untain ValleY4 CA — F.-Jectrical <br />Engineer for the design of the new Burris Pump Station which consists of four 1,750 horsepower <br />vertical turbine pumps delivering a maximum flow rate of 200 rfs to the Santiago Basins from <br />Burris Basin, Work consists of reviewing the Burris Pump.Stati0h construction phase shop <br />drawings, performing design revision, and providing answers to RFIs, <br />I'J <br />Elizabeth Reservoir, Booster Pump Station and Well No. 29, City of South Gate, South <br />Gate, CA — Engineering design services for a water storage tank and booster pump station and <br />a water well with disinfection equipment. Electrical engineering services Included three new 125 <br />horsepower booster pumps and adding and Installing now conduits and wires to the now <br />pumps, Responsible for preparing pie ns, specifications, and load calculation to modify the <br />facility's extensive distribution system. Site Investigations were conducted to verify ratings, <br />settings, and locations of equipment. Working with utility company to provide now service to the <br />project, <br />City of Loma Linda, Son Bernardino, CA — Upgraded old drinking water Well$ with large <br />VFI)s. Installed six -pulse and eighteen- pulse VFDs that varied In size from 200 hp to 800 hp. <br />The design Included upgrading electrical service, Installing new switchboards and MCC% <br />installing harmonic filters, upgrading Instrumentatlonand control system and reconnecting to the <br />existing 6CADA system, <br />Page 2 <br />25E-208 <br />