My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TETRATEC.H <br />I <br />Mr. Neggivelt has provided design erigine.el -Ing In various water <br />and wastewater projects Including domestloand reclaimed water <br />pipelines, water main replacement$, gravity sewer mains, pump <br />stations, lift statlo.n% reinforced concrete reservoirs, flow control <br />facilities, osayolod.water customer conversion$, arid pressure <br />reducing valve vaults. Responsibilities have Included preparation <br />of construction plans; specifications; and design calculations; <br />asslated supervisors In preparing Project memorandums. <br />EXPERIENCE <br />sign Services, <br />or CA — Design of four <br />Net Park In the City -of <br />ct, In addition to the <br />wells, the project <br />baoldlush pipeline, <br />monitoring well site, <br />as rovids and parking <br />lots, <br />Irvine Desal , ter Project -Potable and Non�Potable Wall Drilling <br />arid EquippWo, Irvine Rauch Water District, Irvine, CA — <br />Design Engineer for the preparation.0f plans and specifications <br />for the drilling andequippIng of design of well drilling for five <br />potable water wells and one non-potablIewater well. This <br />included wellhead equipping for each well for both abovegrot,ind <br />and belowground facilities. Also included In this project was <br />modification to an existing non -Potable water well, <br />Robertson's Ready Mix Recycled Water Pipeline -and <br />Conversion, Irvine Ranoh Water District Irvine, CA — Design <br />Engineer for the design of 650 feet of Unch pim appurtenances <br />end above ground flow meter assembly to serve Robertson's <br />Ready Mix recycled water, The project also Included assisting <br />the District whh evaluating the necessary on -site modifications <br />and coordinating with County and State Health Officials. <br />Recycled Water Distribution System Expans.lon, RW <br />Customer Retrofits, El Toro Water District, Laguna Woods, <br />CA - Provided design services for over 200 Irrigation meters <br />within Laguna Woods Village, City of Laguna Woods and City of <br />Laguna Hills, Work Included preparing technical memorandums <br />for each major customer, performing preliminary site Irrigation <br />spray tests, design of recycled water retrofit plans for each <br />property parcoJ, submittal to $late and County Departments of <br />Public Health (DPH) for recycled water retrofit plan review of <br />each property, Working closely with the El Toro Water District, <br />State and County Departments of Public Health, and each of the <br />retrofit customers was critical to the success of this project. <br />Cory Heggtvelt <br />Local/State Health <br />15,00afflow <br />8A., Civil Engineering. <br />0611fornis Slats UnIvertity, <br />Long SeoCh, 2000 <br />eftolnear in TrAnIno, <br />Calitbrolis, 2005, N6,121854 <br />QM06: <br />Irvine, onliftsmis <br />Years of Experience: <br />16 <br />YearswI&VitraTooh., <br />Is <br />0 <br />0 <br />G <br />0 <br />0 <br />0 <br />�J <br />�3 <br />�11 P <br />,J <br />Page I <br />25E-21 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.