|
NTETRATECH
<br />Nicole Han, PE
<br />Electrical/Instrurnentation Design
<br />Ms.. Hain Is experienced In the. electrical design of water and
<br />w4pagon:
<br />Wastewater plants, system studies,power distribution, emisrgency
<br />M.S., Electrical Engineeft,
<br />power supply, motor and Instrumentation control. Her projects
<br />SDU11110M.Cellisfrid
<br />16clude designing water and Wastewater plants,deselination
<br />University
<br />Los Angeles, 2012
<br />pisritsi. lift sWtfons, pump atoj1pns, drinking wat6rwplls. pipelines
<br />and, order control sistems,
<br />Training and Cerfficaflons:
<br />EXPERIENCE
<br />Professional Elpatript
<br />5n Inew
<br />Mid -Basin Centennial Park, City of'Santa Ana, SantA Ana, CA
<br />.03116rnla, 20115, No. 21420
<br />Four injection wells are include
<br />41h this project and will be
<br />Professional Affiliations.
<br />constructed below ground vauitt. Wells art proposed to Inject 12
<br />Notate of Elactriml end
<br />MOD of GWR8 water into the principal groundwater-agulfer
<br />lJockorres En.01creers IEEE
<br />approximately 1,200 feet below round . surface, bubmirsible
<br />Office:
<br />bboldlush pumps will k, Within the Injection wells.
<br />Irvine. COIROtAls
<br />Electrical Engineer responsible for designing two 64arod ktilitieW
<br />Powiar disItribution, Injection W611's, Irittrumentation and control,
<br />ypairs of Experienw:
<br />communication With the other sites and.headlquartom.,
<br />Four
<br />Well �No. 7, City of inglawOod, Inglewood, CA — EleWfcal
<br />Years with Tatra Yeah:
<br />Engineer for designing power distribution, I strumentation control
<br />TWO
<br />plans and specs. The project Is to develop -a ground water source
<br />of portable Water.
<br />Lome Linda University Andemon No. 4 Woff, Lorna Linda, CA
<br />— Electrical Engineer responsible f0creAtIng,oloctrIcal plans,
<br />specifications, electrical load schedules, panel schedules, conduit
<br />and wire sizing, electrical details, emergency standby generator
<br />sizing, creation of pump control schernaticsi . And drafting technical
<br />,
<br />specifications, The project design Includes pro v1ding a now pump,
<br />a new PLC system to control well pump and providing lighting
<br />system.
<br />Elizabeth Reservoir, Booster Pump Station and Well No, 29,
<br />City of South Gets, South Gato, CA — Engineering design
<br />services for a water storage tank and boosterpump station and a
<br />water wait with disinfection equipment. Electrical engineering
<br />services Included three new 126 horsepower booster pumps and
<br />adding and Installing new conduits and wires to the new pumps,
<br />Responsible for preparing plans, specifications, and load
<br />calculation to modify the facility's extensive distribution system.
<br />Site Investigations were conducted to verify ratings, settings, and
<br />locations of equipment. Working with utility company to'provide
<br />now service to the project.
<br />Crooke Reservoir Electrical Upgrade, City of Santa Ana,
<br />Santa Ana, CA — Electrical Engineer for the design of the
<br />replacement of the existing motor control panels and switchboards
<br />for Crooke Reservoir pump station, Well 27 and Well 28,
<br />Page 1
<br />25E-209
<br />
|