Laserfiche WebLink
NTETRATECH <br />Nicole Han, PE <br />Electrical/Instrurnentation Design <br />Ms.. Hain Is experienced In the. electrical design of water and <br />w4pagon: <br />Wastewater plants, system studies,power distribution, emisrgency <br />M.S., Electrical Engineeft, <br />power supply, motor and Instrumentation control. Her projects <br />SDU11110M.Cellisfrid <br />16clude designing water and Wastewater plants,deselination <br />University <br />Los Angeles, 2012 <br />pisritsi. lift sWtfons, pump atoj1pns, drinking wat6rwplls. pipelines <br />and, order control sistems, <br />Training and Cerfficaflons: <br />EXPERIENCE <br />Professional Elpatript <br />5n Inew <br />Mid -Basin Centennial Park, City of'Santa Ana, SantA Ana, CA <br />.03116rnla, 20115, No. 21420 <br />Four injection wells are include <br />41h this project and will be <br />Professional Affiliations. <br />constructed below ground vauitt. Wells art proposed to Inject 12 <br />Notate of Elactriml end <br />MOD of GWR8 water into the principal groundwater-agulfer <br />lJockorres En.01creers IEEE <br />approximately 1,200 feet below round . surface, bubmirsible <br />Office: <br />bboldlush pumps will k, Within the Injection wells. <br />Irvine. COIROtAls <br />Electrical Engineer responsible for designing two 64arod ktilitieW <br />Powiar disItribution, Injection W611's, Irittrumentation and control, <br />ypairs of Experienw: <br />communication With the other sites and.headlquartom., <br />Four <br />Well �No. 7, City of inglawOod, Inglewood, CA — EleWfcal <br />Years with Tatra Yeah: <br />Engineer for designing power distribution, I strumentation control <br />TWO <br />plans and specs. The project Is to develop -a ground water source <br />of portable Water. <br />Lome Linda University Andemon No. 4 Woff, Lorna Linda, CA <br />— Electrical Engineer responsible f0creAtIng,oloctrIcal plans, <br />specifications, electrical load schedules, panel schedules, conduit <br />and wire sizing, electrical details, emergency standby generator <br />sizing, creation of pump control schernaticsi . And drafting technical <br />, <br />specifications, The project design Includes pro v1ding a now pump, <br />a new PLC system to control well pump and providing lighting <br />system. <br />Elizabeth Reservoir, Booster Pump Station and Well No, 29, <br />City of South Gets, South Gato, CA — Engineering design <br />services for a water storage tank and boosterpump station and a <br />water wait with disinfection equipment. Electrical engineering <br />services Included three new 126 horsepower booster pumps and <br />adding and Installing new conduits and wires to the new pumps, <br />Responsible for preparing plans, specifications, and load <br />calculation to modify the facility's extensive distribution system. <br />Site Investigations were conducted to verify ratings, settings, and <br />locations of equipment. Working with utility company to'provide <br />now service to the project. <br />Crooke Reservoir Electrical Upgrade, City of Santa Ana, <br />Santa Ana, CA — Electrical Engineer for the design of the <br />replacement of the existing motor control panels and switchboards <br />for Crooke Reservoir pump station, Well 27 and Well 28, <br />Page 1 <br />25E-209 <br />