My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TETRATECH Paula Fell <br />CV <br />ef <br />CEQAIEIR <br />G <br />0 <br />Irvine Unified School District, Contra! Kitchen Project at Creekside Education Center <br />Project Initial Stud.y/Mitigated Negative Declaration, Irvine, CA — Managed the preparation <br />. <br />of initial StudylMitigated Negative 0 eclaration. and supporting notices for the project. In <br />addition, supervised the preparation,of air quality, noise, and traffic studies. <br />Long Beach UpIftod School. District, Roosevolt Elothentary School Project Environmental <br />Impact Reporto Long Beach, CA —Manmoed and prepared an Environmental Impact Report. <br />Also managed the preparation of technical studies for Air quality impacts, greenhouse gases <br />amissiong, riolse Impacts, and historic resources. <br />Los Angeles Unified School District. South Region High School No,. 8 Project <br />Environmental Impact Report,'Los Angeles, CA � Managed theprepatat lon.of the <br />Environmental Impact Report. Also managed the. preparation of technical. studies for air quality <br />impacts, greenhouse gases emissions, noise Impicts, and hazards and hazardous materials. <br />Los Angeles Unified School District Central Region Elementary School No. 20 Project, <br />Environmental Impact Report, Los Angeles, CA — managed preparation of the Environmental <br />impact Report. Also managed the preparation, of technical studies for air -qualify impatt9i <br />greenhouse gases- emissions, no4se imipacts, hazards and hazardous materials, andecopIng <br />meeting PowerPoint presentation. <br />01 <br />Hesperia Unifled School District, El Centro Elementary Now School Project Initial <br />StudyXitigated Negative Declaration, Hesperia, CA — Managed and prepared an Initial <br />Study/Mitio.ated Negative Declaration, Provided cooperative support during the DIsirlot's change <br />In facilities directors, ensuring project completion without any delays, <br />Montelbollo Unified School Distr ' Ict,..Jos6ph Goscon 51omorrwk.Y�School Modernization <br />Project Initial Study]MI(Igated Negative Declaration, Montebello, CA — Managed <br />k <br />preparation of an Initial Study/Millgated Negative Declaration. <br />Beverly Hills Unified School District, Beverly Vista Elementary School Modernization <br />0 <br />Project Environmental Inapact Report, Beverly Hills, CA — Assisted with the preparation of <br />the Environmental Impact Report, <br />Pasadena Unified School District, PasadenA.UnIfied School District Modernization <br />Program Initial Studies, Pasadena, CA — Prepared 39 Initial Studies for modernization of $3 <br />Orange County Flood Control District, SARI Abandonment and Pipe Soveting Project <br />SEA/Environmental Impact Report Addendum, Orange County, CA — Assisted with the <br />preparation of the Supplemental Environmental Assessment/Environmental Impact Report arid <br />I <br />specifically prepared analysis for several resource topics Including: water resources and <br />J <br />hydrology; earth resources; aesthetics; safety and hazards; and public services and utilities. <br />Page 2 <br />25E-212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.