Laserfiche WebLink
NTETRATECH <br />Astrid Fleischer is an alectricaland controls systems engineer With <br />26 years of experience In water and Wastewater treatment, capital <br />Improvement and Industrial control *Projects, Me Flels6her's electrical <br />and controls design experience Includes Projects In California end <br />overseas involvInCodoon Quantum Automation Platform, <br />Siemens 81motto. LCs, Allen Bradley RSLogix5DOO programming <br />Installation and support services for Wonlorwaro Wouoh 14M], <br />Wondorware Active Factory, Wohdorware Historim, Installation and <br />maintenance of Marathon Endurance.V17virtual Redundant , Solver <br />Systems, $NMP Network Management Implementation and <br />intogratl on Into Plant HMI and network design, configurp;Ion and <br />troubleshooting. AddItIQnpIIy,.AstrId Is proficient in standard <br />tonfligilrotion 0? $ofikolaer Mediric Network Infrastructure Devices <br />(FlWe.OpUoReposters,-SwiWhe*),.Intedmooprogrammirg for - <br />Prollbus OP and.doelign.and' Inliagrallon of Proom Control <br />Application Interfacing with Variable Prequency Drives (VFDs). <br />EXPERIENCE <br />$CADA System Project, West Basin Municipal Water District <br />Carson, CA — 1&0 Engineer — Specified the project's network <br />equipment W technology (413 callulat) as W611 awthe SCADA <br />application software (SQADA Expert ClearSCADA) for the new <br />SCADA network. <br />Otaylfter Treatment Plant, City of San Diego, CA — Project <br />Engineer —* Plant upgrade included -chlorine dioxide generator and <br />contactor, pumped backwash, now flocculation and sedimentation <br />basin, replacement of filters, SCADA system upgrade. Designed <br />and programmed the PLC and the Woriderwore HMI application for <br />filter level control and automated backwash sequence. Developed a <br />comprehensive model of the plant In PIC$ Simulation software to <br />use for an in depth system test and simulation, Simulation of all 10 <br />points and modeling of all controlled systems reduced start-up time <br />by an estimated,80 percent. <br />Pyrite Canyon Treatment Facility, State of California, <br />Department of Toxic Substances Control Glen Avon, CA — I&C <br />Engineer — Reviewed Instrumentation & C;Wol and Electrical <br />submittals from Vendor supplied packaged systems such as fifter <br />presses, beg presses, air compressors, booster pumps, Inclined <br />plate clar N !art, flocculating clarliffers and others. <br />Alamitos Barderrellometry System Upgrade, County of Los <br />Angeles Department of PuOlic Works, Los Angeles, CA — I&C <br />Engineer — Specified the project's Siemens 87-1200 control system <br />and network equipment, Designed the project's control and <br />Instrumentation panels Including panel load calculations and design <br />of the photovoltaic power supply for the control panels. Prepared <br />project documents such as conduit schedules, project drawings and <br />project specifications. <br />Pnge I <br />25E-213 <br />Astrid Fleischer, PE <br />SCADA <br />Education: <br />Professional Enghoerin <br />Control System Eoginotefing <br />(PE), California <br />Badhelor of Sblenoa <br />Elecilloal Engineering <br />'University of Nuremberg, <br />06mohy <br />Vocaflons(college for <br />Electrical Enotheering and <br />Date Systems Technology <br />ErWrigeni Germany <br />RaglitratlordOerfiftcatlon� <br />Regirdered POf 0461onal <br />Engkiwar)n Control. <br />Systems, California:N6. ts <br />7440 <br />Office., <br />111vine, OA <br />Years of Experience: <br />.26 <br />Years with Tatra Tech: <br />TWO <br />Key Areas of Experience: <br />Process control design, <br />Implementailon,.start-up and <br />maintoranr rvQ00 <br />,4se I <br />Project management, <br />Process control review and <br />consultant services <br />Project Lead Engineer <br />Prograniming, installation <br />and support services <br />