Laserfiche WebLink
HUITT-ZOLLARS <br />MIGUEL HERNANDEZ,PE, PLS, QSD <br />Project Manager - Huitt-Zollars <br />Miguel Hernandez has more than 20 years of experience in Public Works and Is proficient With the design of <br />streets, highways, sewer, water, storm drain, grading, hydrology and hydraulics. His experience combined <br />with his ability to communicate will make him a valuable asset to a project. As a Project Manager fie <br />will be helpful in coordinating all design inclinations and finding the appropriate balance. When critical <br />deadlines need to be met his proven ability to work under pressure will be invaluable. <br />RELEVANT PROJECT EXPERIENCE <br />Mojave Solar Project - Ifinkley, CA <br />Ensure all construction work conformed to applicable LORS, coordinated traffic detour plans, reviewed <br />OSP activities, prepared documents to initiate revisions to approved drawings, responsible for work load <br />reports and monitored progress of construction schedule, The project moved over 750,000 CY of $oil <br />during the grading activities that required coordination with survey crows and grading contractor, To <br />protect the site from large storm events and balance did moving activity 18,000 LF of channel were cut, <br />The solar plant Included rehabilitation of six existing water wells and drilling of four now water wells. <br />Six existing water wells were used for construction water. After construction, two large existing wells <br />were retrofitted and connected to four now water wells to provide water for domestic and power plant <br />use. The two power plants Included four water tanks total. <br />Farragult Avenue Improvements - Morena Valley, CA <br />Hernandez was the Project Manager for improvements that included sidewalk, curb, gutters, driveways <br />drainage, access ramps, utility adjustments, shod property walls, missing street lights, pavement <br />repairs, and accommodation of upgraded water line (built in advance by BSMWC) in order to enhance <br />safety and accessibility for commuters and pedestrians on Farragut Avenue from Sherman Avenue to <br />Ellsworth Street. <br />Jeffrey Road/Portola Parkway Street Improvements - Irvine, CA <br />Hernandez was the Project Manager for the civil design and survey of a new alignment of 1.5 miles of <br />Jeffrey Road and 1.0 mile of Portola Parkway. Work included roadway rehabilitation, electrical conduits, <br />cable/telephone improvements, right-of-way engineering, potholing, and grading. Work also included <br />preparation of Infrastructure plans, including storm drain design, 72-inrhes to 10-inches in diameter <br />over 10,000 feet of pipe, hydrology and hydraulic calculations, sewer plans, d(y utilities, specifications, <br />and construction cost estimates. Jeffrey Road and Portals Parkway were designed for a six -lane highway <br />with raised medians, new curb and gutter to replace open ditch channels, pedestrian undercrossing. <br />Cerritos Avenue Gap Closure - Anakelin, CA <br />Hernandez was the Project Manager for this project located on Cerritos Avenue from Euclid Street to <br />approximately 600 feet east of Euclid Street, The project constructed a five foot wide ADA compliant <br />sidewalk and new storm drain laterals with catch basins. The work also included the construction of <br />block walls and fences. The now sidewalk eliminates the need for pedestrians to walk along the side of <br />the road. Cerritos is designated as a four lane secondary arterial by the County's Master Plan of Arterial <br />Highways (MPAH) with average daily traffic of 9,400 vehicles per day. The project will provide a safer <br />and better access for the schODI children and pedestrians in general. The services included right of way <br />acquisition. <br />Sao Sectlan E., Relevant Prolect Experlence for additionalprojects. <br />25E-250 <br />City of Santa Ana Civil Engineering Services; RFP 17-083 <br />oil <br />k <br />