My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Huitt-Zollers was responsible for the Topographic Survey for <br />that portion of Warner Avenue from westerly of Main Street to <br />easterly of Oak Avenue. Work included establishment of horizontal <br />control based on the centerlina at Warner Avenue and the <br />establishment of vertical control; tying out the existing centerline <br />morrumentation prior to construction and the preparation of Pre - <br />Construction Comer Records to be used during the construction <br />phases of the project by surveyors doing boundary work In the <br />area and for replacement of the monuments that were destroyed <br />during construction; setting and control of aerial targets and <br />photo ID points; flight, photography, and compilation of the aerial <br />topographic mapping; cross-section survey at 25 foot Intervals <br />and a detailed design survey of all existing improvements from <br />R/W line to R/W line; and the preparation of a Topographic Map <br />showing the results of the work. <br />. . 0 6 <br />Hultt-Zol lars prepared the design of approximately 6,000 of 12" HDPE filghline for rocycied waterto assist the WatordIstrict In the transportation <br />of recycled waterthrough the Santa Margarita Water District. Hullt-Zollars also assisted the Santa Margarita Water district in the design and <br />construction of a booster pump station to boost the pressure of the recycled water line through multiple pressure zones. <br />Additionally, fluitt-Zollars worked with Santa Margarita Water District to prepare multiple details to switch pipe materials and underground <br />the highliae into a casing and create a crossing of a secondary arterial highway. The design was completed to allow for the maintenance of <br />the pipe without disrupting traffic on the highway, <br />HUITT-ZOLLABS City of Santa Ana Civil Engineering Services: AFP 17-083 14 <br />25E-284 <br />cw <br />01 <br />J-j <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.