Laserfiche WebLink
Huitt-Zollers was responsible for the Topographic Survey for <br />that portion of Warner Avenue from westerly of Main Street to <br />easterly of Oak Avenue. Work included establishment of horizontal <br />control based on the centerlina at Warner Avenue and the <br />establishment of vertical control; tying out the existing centerline <br />morrumentation prior to construction and the preparation of Pre - <br />Construction Comer Records to be used during the construction <br />phases of the project by surveyors doing boundary work In the <br />area and for replacement of the monuments that were destroyed <br />during construction; setting and control of aerial targets and <br />photo ID points; flight, photography, and compilation of the aerial <br />topographic mapping; cross-section survey at 25 foot Intervals <br />and a detailed design survey of all existing improvements from <br />R/W line to R/W line; and the preparation of a Topographic Map <br />showing the results of the work. <br />. . 0 6 <br />Hultt-Zol lars prepared the design of approximately 6,000 of 12" HDPE filghline for rocycied waterto assist the WatordIstrict In the transportation <br />of recycled waterthrough the Santa Margarita Water District. Hullt-Zollars also assisted the Santa Margarita Water district in the design and <br />construction of a booster pump station to boost the pressure of the recycled water line through multiple pressure zones. <br />Additionally, fluitt-Zollars worked with Santa Margarita Water District to prepare multiple details to switch pipe materials and underground <br />the highliae into a casing and create a crossing of a secondary arterial highway. The design was completed to allow for the maintenance of <br />the pipe without disrupting traffic on the highway, <br />HUITT-ZOLLABS City of Santa Ana Civil Engineering Services: AFP 17-083 14 <br />25E-284 <br />cw <br />01 <br />J-j <br />J <br />