Laserfiche WebLink
Nardy Khan - Deputy Director <br />County of Orange Public Works <br />300 N. Flower Street <br />Santa Ana, CA 92702 <br />714.920.7454 <br />nardy.khran0opmacgov.com <br />0 R A H � V 0 0 U #1 Y V <br />L)CPubficWorks <br />HZ prepared FISH and right-of-way documents for the County's 3.7-mile-long, $75 Million La rate Avenue gap closure and widening project. <br />Liza Munoz, PE - Senior Office Engineer <br />Inland Empire Utilities Agency <br />6075 Kimball Avenue <br />Chino, CA 91708 <br />909,993.1522 <br />Imunoz@ioua.org <br />HZ designed a roadway widening along El Prado Road and Mountain Avenue for the City of Chino, <br />Lupo Camacho - City Project Engineer <br />City of Chino Public Works <br />13220 Central Avenue <br />Chino, CA 91710 <br />909,334,3406 <br />leamacho@cityofchino.org <br />OLn���,Icy <br />A MUNICIPAL WATM VISTRICY <br />HZ prepared the preliminary and final drainage analysis and Improvement plans for the extension of a 72-inch storm drain main along Ross <br />Avenue, Walnut Avenue, and Magnolia Avenue from Riverside Drive to the 60 Freeway. <br />City of Santa Ana Civil Engineering Services: RFP 17-083 15 <br />25E-285 <br />