Laserfiche WebLink
DESIGN SCHEDULE <br />Klokoff <br />Base OADlYfile <br />June <br />JPfle 29 <br />Gactechfilual Report <br />July 27 <br />OraLpago Report <br />Julk 27 <br />filtirrs� Reprids, boilicallons, and rstimste's 3.0% <br />Afthl <br />$iiPtarriber 14 <br />Plans, Report$, speftations, and Estimates 60% <br />Ducembor 7 <br />Plant, Repoda, 9pWicstloms, and Estimotes 100ti. <br />Bidding Period <br />April -May <br />916voff Construction <br />Juno <br />Pleate find our Fee P(oposa I in tire separate sealed envolo Pe laboled "Fee Proposal." <br />HUITMOLM <br />City of Santa Ana Civi I Engineering. Services: RFP 17-083 19 <br />25E-289 <br />