Sith-hesk 17 Riy UUNks — Undergrounding existing powerflnuis Is possible If SCE accepts proposed switch locations. As described In the <br />approach cooreffnatlon with SCIE would occur In two phases. Our current scope Is limited to street design. HZ will coordinate with third party <br />purveyors to find feasible alignments for dry utility. The proposed alignment would be Incorporated Into a conflict exhibit for evaluation. 1he <br />coordination Is limited to the street Improvement design period. <br />84-lasUSSoadficatlens— HZ will utilize City of Santa Ana standard bid specifications and/or the latest edition of the Standard Specifications <br />for Public Works Construction and edit them to fit the project requirements. <br />Soh-laskM Estimates of Probable Cost— HZ will prepare estimates of probable cost for the proposed Improvements. <br />Sub-lask). 10014PIons - HZ will prepare utility plans this Includes on notion for potholes to investigate existing utility size and depth. Further <br />Investigation will be necessary where record Information is unreliable and thought to cause a conflict with proposed Improvements. Existing <br />manholes will be dipped where possible to verify inverts and pipe size. Notices will be sent to impacted utility companies and every effort will be 0 <br />made to resolve conflicts prior to 60% submittal. <br />Slib-laski.1 I filsposidon, Plans— Removals are limited to Infrastructure within project limits <br />Option A: Typical Street Improvement set will include: Option 0: Typical Street Improvement set will Include: <br />1. Itle Sheet 1. Title Shoot 9. Signing & Striping Details <br />2. IndexSheet 2. Index Sheet 10. Sound Wall Plan .(3 sheets) <br />3. Disposition Plan 3. Disposition Plan M Sound Wall Details <br />4. Street Plans (if Required) 4. Street Improvement Plans (5 12. Streetlight Plan (3 sheets <br />5. Utility Improvement Plans (2 sheets) shoots) double stacked) <br />6. Water Wall Rehabilitation Plan 5. Details & Typical Cress 13, Streetlight Details <br />7. Details and Typical Gross Sections Sections 14. Landscape & Irrigation Plan (3 <br />6. Storm Drain Improvements — (2 shoots-doubla stacked) <br />shoots) 16. Landscape & Irrigation Details <br />7, Drainage Details <br />8, Signing & Striping Plans (3 <br />sheets -double stacked) <br />TASK K: Construction Administration Services (Optional) <br />0 <br />Sab-lasA V Old Support— IIZ will be available to attend the pro -bid meeting. Our team will review contractors RIFIs if requested by the City <br />during the bidding phase. <br />Sub -Task X2 Construction Suppofl— HZ will In if HZ drawings <br />participate construction meetings necessary. will review submittals and shop <br />required to support the construction contract. Reviews will be completed within 10 working days of recel Contractor change orders will be <br />completed within two working days of receipt, HZ will be available as requested bythe City to resolve discrepancies In contract documents, HZ <br />will furnish necessary revisions to documents due to ents andhr emission at no cost, <br />$0-Fask X3 Record Drawings — The contractor shall provide as-bulft redlines, 117 will revise approved plans per contractor comments to <br />produce record drawings. <br />Sult-Task Mftfovt Choso-Out- HZ will assist in the development of the project punch list as related to the construction package prepared by <br />ourteam, <br />HUITEZOLM City of Santa Ana Civil Engineering Services; RFP 17-083 18 <br />25E-288 <br />