Laserfiche WebLink
HUITF-ZOLM <br />JOHNNY MURAD, PE, MS, QSD <br />U10ity Design - livitt-Zollars <br />Johnny Muted brings 20 years of experience In civil engineering consulting. He has assisted numerous clients <br />In site selections, feasibility studies, preliminary construction cost estimates, earthwork estimates, plan <br />check and permit fee estimates, conceptual site planning, final design, and construction administration. His <br />experience gives him a good understanding of project costing techniques and calculations, which can help <br />keep the project cost at a minimum without losing efficiency and, thereby, help his clients stay within their <br />planned project budget and maintain their strength in the market. <br />RELEVANT PROJECT EXPERIENCE <br />("T <br />Alder Avenue, Casa Grande Drive, Summit Avenue, and Mango Avenue Sewer Improvements — Rialto, CA <br />Redlands Boulevard Sewer Improvements — Moreno V8116y, CA <br />Brodlaim Avenue, Cactus Avenue, )oy Street, Gilbert Street, Robecoo Street, Frederick Street, and <br />Reacock Sewer Valley, CA <br />0 <br />Street Improvements —Moreno <br />Son Bernardino Avenue Sewer Improvements — San Bernardino, CA <br />0 i <br />City of Rialto, Tract No. 18304 Sewer Improvements — Rialto, CA <br />Cl <br />0 <br />WILLIAM WALLACE, PE <br />S t 111 C t I/ I 11 E a Ly i a e e r I I if i t t - Z o 11 a I S <br />William Wallace has more than 37 years of experience as a Structural Engineer. He has been involved in <br />the design of many highly complex structures for flood control and soil and water conservation construction <br />programs for the Corps of Engineers (COE) and the Natural Resources Conservation Service INKS). Projects <br />have included reinforced concrete hydraulic structures such as trapezoidal channel paving, rectangular <br />channels, Impact basins, drop structures, retaining walls, and reinforced concrete for principal and auxiliary <br />spillways of lakes and dams. Wallace provided the structural design or provided peer reviews of projects <br />where the objectives of the project was to design modifications to dams and their appurtenant structures to <br />millgaterisks relatedtodain safetyconcerns; andto meetcurrent regulations and standardsas provided by <br />Conservation Districts, NRCS, COE, and various Departments of Water Resources. <br />RELEVANT PROJECT EXPERIENCE <br />Oxnard Village Flood Control Facilities - Oxnard, CA <br />Cottonwood Creek Trail and Bank Stabilization — Allen, Texas <br />Rush Creek Channel Erosion Control - Arlington, TX <br />Channel Improvement Project — rort Worth, TX <br />Brazos River Study — TX <br />Lake Ray Roberts Ontletworks Conduit and Power Penstock — take RayRoberts, TX <br />City of Santa Ana Civil Engineering Services: RFP 17-083 <br />25E-300 <br />