Laserfiche WebLink
CSG PROPOSALM SANTA ANA <br />MILEONORWECr <br />I :M =. I I rz 4", <br />CSG has extensive experience 16 the design and rnanag6ent of complete streets andpavement <br />rehabilitation projects throughout California, Projects have utlilied various methods of pavement <br />maintenance and rehabilitation, MudingdIllouts, full depth mlcm�surfadrvg, scrub, <br />chip, and cold In -place recycling. A sampling of similar projects CSG has managed and designed Is provided <br />below, Riong with references, <br />HILLSIDE BOULEVARD REHABILITATION -AND BEAUTIFICATIONp PHASE I I TOWN <br />OF COLIMA, CA <br />Winner afthe 201SAPWA 011con Valley Arojectof the yearfor Small Cltleslftaral Communities <br />The Towpof(ohnt solatted C$G tontanage tharehoblift4tion Hillside goolovaed, a <br />principal nodth�southarterlal through the Town, WhIch spans approximately I.Smltes Oom the Daly City city <br />limit to the SOqth 94A FfOnds(o.dlyffmit. CSG Was InVolvad in the, master 019MIng, final design and <br />construction of this beautification.project, During the master planning stage of the project, CS6 conducted <br />traffic stutilesi'attohdW study sessions With various TowNs departmental directors, presented out <br />ronceptual ciesign to the community at two public meetings and affectIvelycoordinoted with project <br />stikeholdors,0ty Otaft and City Council to review and approve an aesthetically pleashig datign conc6pt which <br />was In compliance with the ToWn's roeneral Plan and Master Sign PrGSTam. CSG worked closely with the <br />PIPOITIA9 06pa0mont to (ftiNgr a tolveptool design that iliccniaorated all elements of �ocmpleto ttreets,� <br />Including sidewalks, tigiTtIng, and bike fares. Design elements Incorporated sheltered leftturns to act as <br />traffic calming mesoures, additional street porft continuous bike laoe�,, � continuous sidewalk where none <br />exist before, curb ramps,rectongular rapid floshInts beacons, and laWretention areas, or "raln sardenso. Two <br />traffic signal modifications were completed to match the'now layout end bring those signals up to current <br />standards, The design Incorporated a retrofit to all Intersections andpeclestrian access points throughout the <br />corrldor In order to meet ADA requirements, In addition, the entire length of roadweywas rehabilitated by <br />full -depth reconstruction. <br />SAFE ROUTES TO SCHbOLS I CITY OF SAN MATEO, CA <br />C%G Consultants was selected by the City of San Mateo to provide both topographlosurvey and design <br />services for this federally -funded project, CSG acted as the prtme,consultant for the topographic survey <br />effort, which Included topographic survey for is School sites and a total of 32 local intersect ' ions, The design <br />scope Included curb extensions, curb ramps, and rectangular rapid flashing beacons at $even Intersections <br />throughout the City, CSG provided detailed curb ramp designs In accordance with the latest Caltrahs Plan <br />Preparation Manual, Including station data, proposed slopes, and elevation data. CSG reviewed curb <br />extensions Impacts on drainage patterns, and prepared hydrology and hydraulics calculations to support <br />trench drain designs and the modification of an existing drainage Inlet, <br />In addition to preparing the PS&Es for work adjacent to three school sites, CSG helped to coordinate the Work <br />of four design consultants to assemble asinglo bid schedule ondset of technical specificationsin anticipation <br />of the Caltrons C-76 Request to Proceed with Construction. C5G provided conformance reviews of all <br />consultants! plans and estimates to ensure that federal requirements were met, and facilitated coordination <br />between the City and consultants to ensure any potential project issues were addressed In advance of the E. <br />76 Request. CSG also performed a peer review of the City'sfront-end Specifications to ensure that the <br />technical specifications and front-pnd specifications were coordinated, and that federal language was <br />Incorporated, <br />25E-325 <br />