<br />MILE ONe PRojEcr
<br />Avenue. Design work included the installation of class III bikeways with shared -lane marklngs, or 'aharrowe
<br />and appropriate stgqagei bicycle loop detectors and pull boxes, camera systems at Intersections on existing
<br />signal mast arms with newrxindults, and pedestrian push buttons post, and foundation. Additional scope of
<br />work Included upgrades existing non�ADA coMpHiMtr4mlis to ADA compliance, concrete Improvements#
<br />Including sidewalk, curb and gutter;arid valley gutter replacement, drainage Inlet modifications, monument
<br />adjustment, and electrical pull boxes adjustments to,,fin1sRed grade.
<br />STREET RECONSTRUCTION AT VAAIOYS LOCATIONS I CITY OF SAN MATEO, CA
<br />The City of San Mateo selected CSG as their design consultants for street reconstruction at various locations.
<br />The scope of work Included mobilization, traffic tontrot, sion relocations; concrete lmprovements� Include
<br />Installation of ADA curb ramps, sidewalk%, curb &gutter and driveways; concrete road pavement removals
<br />and replacements, asphalt concrete grindliTS; asphalt concrete deep lift 41gout repairs; roadway reflective
<br />cracking milleattsin via crack sealfritau ligrasle enhancement votextile, hot rnIx asphalt paving, utility
<br />adjustments to Wade; catch basin, RCO and HOPE storm drisift pipe Installation; tree removal; pavement
<br />stritaft marld rigs, arid markers, and other related work, Work also Included the preparation of Pattrans.
<br />encroachment permit.
<br />VARIOUS STREETS AND ROADS PAVEMENT PROJECT I CITY OF MILLBRAE, CA
<br />tSIS was selected by the City to perforro the destlip of pavement,
<br />rehabliltatforifor a major City arterial, MIlibrai.eAvernie, and a
<br />residential street, Magnolia Avenue. The Project litcludecipavement
<br />coring sample testing, surveying, pavement recommended ms
<br />report, traffic handling plans. ADA curb ramp upgrades, traffic signal
<br />repair and traffic detours. Stakeholder roordinatiah was required
<br />with (altrans Local Assistance for compliAnce with Federal funding
<br />guidelines (an E-76 was obtained for this project), as wall as Caltnins
<br />Encroachment Permit Departmentfor coordination with Caltrains
<br />design review staff regardingColtmrs owned facilities,
<br />2016-17 STREET RESURFACING PROJECT I CITY OF STOCKTON, CA
<br />Miner Avenve�ArchAlrportftorsd, PershlngAvenveand March Lane are arterlals and collectors which exhibit
<br />alligator cracking, blockerackinM longitudinal/transversecratking, patching and utility cuts, rutting,
<br />depressions, spelling and some prargresaed to base failures. In order to recelvea Federal Regional Surface
<br />TrAnsportatirmfirogram Fundfort-Iscal Year 2016-17,(3ty selected.0Gto perform preliminary and final
<br />design of pavementrehatillitation, and prepare a 058it bid package in an aggressive design schedule, The
<br />scope of the project Included performing Initial visual assessment of pavementconditlons, conducting
<br />pavement section Investigations Including coring and deflection testingi selecting and recommending the
<br />most appropriate pavement treatments with consideration of costs, construction duration and potential
<br />Impacts to the pu4tir, performing life cycle cost analysts for each selected pavement treatment alternative,
<br />developing a pavement recommendation report with preferred treatinents Identified for each roadway,
<br />locating existing survey monuments and right -of -wiry, assisting the City to file corner records after alterations
<br />to the survey monuments, requesting 4tIlIty maps from Strickton's Murrldpal Utility District, Cal Water
<br />Services Company, PG&E, AT&T and Co mcast and coordinating with these utility companies for adjustments
<br />to their facilities, and preparing layout, traffic handlIngand detour plans, construction cost estimate arid
<br />specifications, The types of recommended pavement rehabilitation treatments Included hot mix asphalt mill
<br />and fill replacements, pavement base failure repairs (dIgouts), microsurfacing, pavement patch and leveling,
<br />and crack seallng.