Laserfiche WebLink
CsG PPOPO-W TO SAW ANwAw..--. , , � <br />MILE ONE Paomcz�-- <br />Swpe of Services & Schedule <br />COMPLETE STREET <br />CSG has completed complete street engineering design for several agencies. These project9peovide <br />Accommodations for pedestrians, bicytellits, vehicles, and Publictrartsportation:16 a safe and efficient <br />manner. The selection of appropriate suttee materials Must cater to the primary usar(s), identifying <br />optimized climorisiditts. based on tight of way resttletiOnS, b0getx and Mult-usability, can dictate the detlan's <br />grading, edge treatments, vertical clearanoeli, 0 Ad clearing, and gru labing requirements, For ApA tompliAnce <br />the design will moot All requinannents for longitudinal and croas slo.pps, Width a rld helaht cletam nces, and the <br />use of detectable warning surfates at velticularcrossinilig. our approach to drainage design Includes analysis <br />of the drainage patt0nabd modifying the grading as needed, Impleftntollon',of c4th basins and buried <br />010 networks to connect to exIstingstorm drain system$,. cso comprehensive design Includes all nocAssaty <br />signagg, stripirlZ lighting, And/or landscaping. Providling usable and safe pallis and/or trails for Comm , unities <br />it an Important part of Mots services. <br />Street Improvements <br />C$Q staffinclodes complete streets and active transportation pr.roject <br />designers.wIth extensive experience on class 1, 43 and eVen the new <br />dass4 bicycle facilities. Some key project components Include: <br />Right of way <br />Funding (federal vs. foot) <br />Materials <br />Shared use facilities <br />Traffic Signal Integration <br />• Signage and ghannelizatlon <br />• SelesmVIOn (buffet) frelrofthicles-flaoth high speed vehicles, <br />and parked vehicles can praiani ha2.ards) <br />• Crossing locations with vehicles <br />GENERAL PROJECT DE$IGN OVERVIEW AND APPROACH <br />CSG has a thorough understanding of the various steps that Are Involved In delivering a successful bikeway <br />and streatscope Project, as outlined in the table below.. <br />CSG will work wig) city staff to deliver a successful, ronstructlon�ready project, Project <br />management and design development efforts will Include the following: <br />1. General Project 0 Field inve4tigatlon <br />Management and a Finalize design concept <br />Design 4 Project Meetings <br />Development 4 Preparation of reports and recommendations <br />* Preparation of plans, sp"Ifications, and estimates (p$&F) <br />0 Manage project schedule and budget <br />6 Bidding/construction support <br />2. Pavement Our staff Is experienced Inavarletyof street rehabilitation strategies, and will roviewthe <br />following options for applicability on the Mile One project; <br />25E-331 <br />