Laserfiche WebLink
C5G PROPOSALTOSAKMANA <br />MILEGNEPROJECT <br />=# - omm- T,?-O <br />COMPLETE STREET <br />C$G has completed complete- street engineering design for several agentla. These projects provide <br />accommodations for pedestrians, bleydists, vehicles, a nd public transportation In a safe and efficient <br />manner. The selection of appropriate su rface materials m ust cater to the prime ry usa.r(4), Identifying <br />optimized dimensions based an right of way restrictions, budoeL and multi-asobility can dictate the design's <br />gracift edge treatments, vertical Clearances, and clearing and grubbing requirements, For ADACcimpl I lance <br />the design will meet all roulromertt for longitudinal and cross slopes, width and holliht clearances, and the <br />use,of detectable warning surfaces at vehicular crossihils, Our opprbachto drainage design InCludes analysis <br />of the drainage patern-and motllf&o the trading as neaded, ImpleMentatlon of catch basins and buried <br />pipe networks to connect to existing storm drain systemsi. CSIS comprehensive design Inclociq oil necessary <br />alg4age, striping, fighting, ahellot landscaping. Providing usable and safe paths and/or.tralls for communities <br />is an Important part of CSG's services. <br />Street Improvements <br />CSS staff Includes Complete. street$ and active transportation prrcIoct <br />designers whK extensive werlonee on class 1, 2, � and even the new <br />Some hey project components Include: <br />• Right of way <br />• Fimclingffederal vs.. local) <br />• Materials <br />4 Shared use fullItles <br />• Traffic Signal Integration <br />• Signage and channolIzation <br />• separation (buffer) from vehicles (both high speed vehicles, <br />and parked vehidles can present hazards) <br />• Crossing locations with vehicles <br />GENERAL PROJECT DESIGN OVERVIEW AND APPROACH <br />CSG has a thorough understanding of the various steps that are Involved in delivering a successful bikeway <br />and streetscape project, as outlined In the table below: <br />CSG will work with City staff to deliver a successful, constructlon-ready project. Project <br />management and desIlln development efforts will Include th a following: <br />Ganeral,Project a Field Investigation <br />management and a finalize design concept <br />Design 4 Project Meetings <br />Development 0 preparation of reports and recommendations <br />A Preparation of plans, specifications, and estimates (PS&5) <br />4 Manage project schedule and budget <br />* aiddfrig/constructlon support <br />21 Pavement Our staff Is experienced In 6 variety of street rehabilitation strategies, and Will mview the <br />following options for applicability on theMile One project: <br />25E-332 <br />