Laserfiche WebLink
utility coordination <br />CSG will coordinate with the various utility agencies that have <br />facilities within the project area to request mapping of their <br />facilities In the are;, and notify utility companies Of ftcltitjes or <br />covers which hood to berolocated or adjusted to grade as a result <br />,of the proposedi.r4pr4v*meAt$; Utility covers Within the project <br />area will he cateloged by either serial photograrnmetry or field <br />reconnaissance and shown on plan. Utility tord1notlon and <br />mapping efforts will assist In developing the required Utility <br />.Certification. <br />it Is anticipated that coordination efforts with utility companies <br />during construction to relocate or adjust their facilities will be <br />performed by the tontractor, <br />Task D - ProlimintirY Design <br />CSG NIMPOSAL TO SANTA ANA <br />MILEONEPROJECT <br />Example of at <br />UtIfitycaver <br />Pr011minary.F.In'dings ToChnicat Mornoriihsium <br />C$G will prepare a memorandum summarizing the filldinPof the data collection effort; Including recommended <br />PiAteratAttreatmentsOn'd c0stestimates based on either (1)..a visual condition survey olook Pr, If authoriged, <br />(2) the, pavement4asign report and testing, provided 4 PEI. <br />Task Del[verables, <br />• Five (5). haralcoplet andon electronic P&'Fof the draft report <br />• Three fg) hard copigs end electric PDAof thefinal report <br />Concept Exhibits <br />CSG Will prepare preliminary design axhIhft§ that Will be used for Initial coordination efforts with <br />Oty/stakoholdersto Identifyiny potential alternativernethdds, and assure Ad malor changes.or ftsurpels%6 <br />occur late in the design process. The purpose of this submittal is to gain conceptual approval of the design by <br />the City. <br />CSG will prepare three -�$) differobt concept exhibit$ as well as a brief summary of advantages and <br />disadvantages, and a budgetiory construction cost estimate, for each option, These concept oxhlb;t� win be <br />submitted for4nternol review by the City prior to finalizing thothree Concepts for the first public meeting. <br />Tisk Dellverables. <br />• Me (5) hard copies and an electronic PAF of the canceptexhiblis, summary, and budgetary cost <br />eslimates <br />• Summorkinginemarandurnof public outreachflndingfmft)firstptihilcme.eting, <br />Task E - Design Development <br />Traffic Signal Design <br />Traffic signal modifications may Involve modifications to the existing signals to provide bicycle detection at <br />Intersections bordering the proposed bike lopes. Video Jetectlan can be added to these Intersections for <br />bicyclists and vehicles, new conduits will be Installed for traffic signal wiring, And existing Inductlon loops will be <br />removed, It Is not anticipated that new traffic signal poles will need to be constructed, CSG will conduct an <br />assessment of the eklstlng traffic signal facilities to determine If now traffic signal poles are required, <br />011ie Lona Addition <br />Modified width of 51 for bike lane may be required width depends on the minimum width required for vehicle <br />traffic lanes. This may be necessary If there are bus traffic in the area. Refinements to the basic concept will be <br />Investigated and compared to find the best optlon, <br />25E-346 <br />