My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CSG PIR)POSALIO SAWA ANA <br />MILE ONE Koxcr <br />30% f Ian$ and'Estimate <br />CSS will provide plansand an estimate of the selected option for each street segment, based on comments <br />received from the City and from project stakeholders atthe first public meeting. <br />It It anticipated that plans will b&prepared at V41Y scale, with two segments of approximately WOO feet of <br />roadway per plan sheet. <br />The 30%submtttal plans are expected to consist of the following.sheets: <br />Tosk D-bliverables, <br />• 7WO (2) 24"Wphard copies and three (31 half size hordeoples of the plans <br />• One (4) CD with digital Copies of ON dOOMMA41h, PDF and, native <br />format <br />• CtftshoctrArequiPmentlappurtenmces, as needed <br />• Documentation Of outreach with VOIRP owners with facilities to he adjusted to grade <br />• ProecMhedole Update <br />o, 30% Construction Cost Eitimete <br />labie$fContentsfortech�itcoispetifications <br />60% Plana, Spaeffications, and Estimate <br />CSO will provide plans arld An estimate at the 60% level, revised per comments received from the City and <br />project stakeholders on the 30% Plans and Itstilmate. The plans will provide suffictent detail to construct the <br />proposed Improvements. It is'antlelpatOd that all M610 prqJ."t Issues wIll be resolved prior this submittal <br />.stage, following the results of the two public meetings and Cltv review periods, <br />CSG will also provide technical specifications/special provisions. The special provisions will be prepared in CS1 <br />format and In accordance with applicable City standards. <br />'task 00fivembles: <br />0 'Two (P) 24"W' hard copies andfourf4l hoffsize hopakople$ of the plans <br />4 One (1) CO with digital copies of all documents In PDF and native format <br />0 Techrdcol ProvislanslSpeeftottans in CSIfiarmat <br />* Project Schedule Update <br />0 6096 Construction Cost Estimate <br /># Responses to City's comments on the 309% submittal and redflnes <br />25E-347 <br />
The URL can be used to link to this page
Your browser does not support the video tag.