Laserfiche WebLink
CSG PROP05ALTO SANTA ANA <br />MILE ONE P110JECr <br />4. Review and approval of sample and material submittals specified In Contract Documents which <br />Impact the design, <br />5. Review of any proposed substitutions for conformonce to the Contract Documents. <br />6. Responding to Construction Change Orders (CCOs) and review of Requests for Quotations, If needed. <br />7. Preparation of Record Drawings based on redllnes provided by the Contractor and field reviews, - <br />our staff 14 highly responsive to requests received during construction, and understands that timely are <br />crucial In avoiding construction delays and claims, <br />CSG has assumed that the following construction -related meetings will be required, as outlined In the RFP: <br />4. Internal Handoff Meeting between Design and Construction Team (CS6 to lead this meeting) <br />S. Pro-constructlon meeting <br />6. Three (3) Construction Progress Meetings <br />7. Pre-FInal Walk Through <br />8, Final Walk Through <br />9. ftLessons Learned Meeting", at the end of the project <br />Additional construction support may be provided as additional scope. <br />Task Defiverables, <br />a Meeting Agehdafor Internal klandoff Meeting <br />& Recofd Drawings in AutaCAD and POF Format <br />25E-349 <br />