Laserfiche WebLink
CSQ PROPOW To SANTA ANA <br />MILCONORNECT <br />Final Plans, Specifications, and Estimate <br />CSGwifl provide plansand on estimate atthe IW%Ievel, revised per comments received from�heCltyon <br />the 60% Submittal. <br />Itis assumod that.goneralpravisloris (Iroftt end" botlerplato) will be provided by the City In Word document <br />.formal for a similar tVpe of project, C$G will tallor these general Provisions for the project, Incorporatingany <br />required specifications to confarm to federal funding requirements. <br />Task Deliverobtas: <br /># Two (2) 24"W"hard copies andfivo f5) hattsize harocoples of the plan� <br />* One (J� CD with digholcoples of oll documents In Paftnd notiveformat <br />100% spcc&atlons� <br />Project Schedule Update <br />0 100% Construction Cost Estim ate <br />0 ResPoftsts to CIO commeMs on the 75% submittal and redilnes <br />Task F - Did Package <br />construdlon-readV sot of <br />4atomerits, Including plans, an estimate,,and spedfications, Aquall(ycontrol review will beperform04 <br />betare.subm.ittaltothe,C,fty.Thi�wUI represOnt Vio.fInal.submittAlof the ME for approval bytheCli:V, <br />The final planvare, expected to consist of -the followino sheets: <br />Title Sheet <br />Demolltion: Plans (V-40'5calo) <br />Uyouts (11'=4W Scale) <br />Signing end Striplog.P.14m 11'mQ'Scole) I <br />Traffic Viinal Plans 4 <br />rask Deliverables: <br />• Ole (1) 24"05" hard copy set of the plans, signed andstamped on each sheet <br />• One hard copli set of the specifications, Printed singl&sIded <br />• One il) CD with digital roples of all documents In Wand nativejormot <br />• RholProject-Schodule Update <br />• Final Construction Cost Estimate <br />Task 6 - Bidding Services <br />0G shall assist the City during loldding to respond to contractors'quanions and Requests for Information <br />(01s), will support the ClWs efforts to Inform plan holders of significant responses to RIFIs, and will develop <br />addenda, as needed. As requested In the RFP, communications with any proposers shall be directed through <br />the City'& Purchasing Officer, <br />Task H - Construction Support Services <br />CSG can assist the City during construction and provide the following support services: <br />1. Attend construction meetings as required, <br />2, Participate In the final Inspection and development Of Punch lists. <br />S. Provide clarifications, as roqtAlred, of construction documents and respond to Contractor's Requests <br />for Information (Arls). <br />25E-348 <br />