Laserfiche WebLink
Michael <br />Ao"'%t <br />Fisher CSG <br />PE, QSD/P <br />Principal Engineer GONSUMANTS <br />Nftae <br />UCENSES and <br />Mr. Fisher is a civil enghreerwith over 25 years of experience in civil/roadwaydoslon, <br />CERTIFICATIONS <br />drainage design, traffic engineerifl& specification writing, engineering report writing and <br />P0410401 (W 6111"Or <br />Project management He has managed toanhs of engineers, working to deliver ever a <br />StOlt d C0442 <br />dozen projects ranging In size from $20,000 to $22,000,600 with project status ranging <br />from project lotlation/fassibillty/st4dy phase to, approvalfisInvironmental phase to final <br />qualiked MR <br />design and construction. Mr6 Fisher has extensive experience workingon roadway desIgn, <br />Including Interoction and m0dian projects. His 4051$n worklilclodes horizontal and <br />vertical geometric layout, utility coordination, traffic signal desion,-signino and striping <br />EDUCATION <br />design and drainage design, His projects have. incotilhorated current LID design practices <br />Iladilot of Woo, fiol t110099. <br />Including blefiltration, Infiltration, and detention basins. <br />San Joe sm tifliveNty <br />ISO Jost, CA <br />RELEVANT EXPERIENCE <br />PROFESS1014AL <br />$unnyvolePovemeritRehohill,tation2Ol7 I City of Sunnyvale, CA <br />AFFILIATIONS <br />Mr, Fisher served as the Project Manager forthis annual street pavement rehabilitation <br />svpo gay oflios �udidatlo <br />prcjw� The icolbe involved the rehabilitation of 2 streett In the City of Spravvelo—, Vork <br />(spq, �&rt prtrldtht <br />included the design of g!lnd and 14MA overlay, diilou% utility adjustments, curb tamps, <br />. ers Inlema(tonal <br />concrete sidewalk, curbguttar and driveway replAcement,,sod striping plans, <br />M. (184671 <br />Fair Oaks 41kewary and Streatscape I City of tunhyvale, CA <br />Mr. Fisher served at the Project Manalidr for the design of Class 2 Bicycle Lanes an fair <br />Oaks Avenue between Old San FrandsW Road to Evelyn Roautt, WerAvartue toArquos. <br />Avenue, and Wolfe Road to Ahwanee Avenue, Key project -elements Included <br />reconfiguring the roadway, roadway resurfacing, addition dFlireeft bike lanes, <br />modiffartIbM to the existing concrete madianislohds, modification otparking, and <br />installation of related sigmae. Mr. Fisher led public outreach meetings to keep the <br />residents Informed of the project. <br />First Street and City Alley Resurfacing Project I City of L94 Altos, CA <br />Mr. Fisher served as the Project Manager for these two resurfacing projects, which <br />I nvolve,robatillitation of 20 city a Ilayways as well as.Flrst Street between West Edith <br />Avenue and Soto Street, He oversaw preparation of the project PS&C package, Basis of <br />Design Report, and coordinated with utility owners for adjustments of their facilities. <br />Junipero Serra at King Boulevard Intersection Improvements I C I ty of S o u th S a n <br />Francisco, CA <br />Mr. Fisher served as the Project Manager for this bicycle and pedestrian friendly traffic <br />signal upgrade project, The project goat was to Improve mobility for all modes, and brings <br />the Intersection up to current stondaeds for bicyclists, pedestrians, and ADA access, <br />Project Included preliminary design, community outreach, agency coordination Induding <br />Caltr;ns. The project scope IncludetIrodesIgn of the existing medians and right -turn <br />Islands to Improve Interaction geometry and provide ADA compliance, replacement of <br />the existing traffic signals located In the median with mast arm signals to Improve <br />visibility, addition of a speed feedback sign on southboundlurilperoSerro, and extension <br />of existing bike lanes along Juniparo Serra Boulevard through the King Drive Intersection <br />to Improve bicycle safety. <br />W. Edith and University crosswalk improvements I City of Los Altos, CA <br />Mr, Fisher served is the Project Manager for the design of traffic calming elements to <br />allow for safe vIsItileerossIng of Edith Avenue. The design also Included the Installation of <br />crosewalksigns and In -ground warning lights, <br />25E-356 <br />