|
Michael
<br />Ao"'%t
<br />Fisher CSG
<br />PE, QSD/P
<br />Principal Engineer GONSUMANTS
<br />Nftae
<br />UCENSES and
<br />Mr. Fisher is a civil enghreerwith over 25 years of experience in civil/roadwaydoslon,
<br />CERTIFICATIONS
<br />drainage design, traffic engineerifl& specification writing, engineering report writing and
<br />P0410401 (W 6111"Or
<br />Project management He has managed toanhs of engineers, working to deliver ever a
<br />StOlt d C0442
<br />dozen projects ranging In size from $20,000 to $22,000,600 with project status ranging
<br />from project lotlation/fassibillty/st4dy phase to, approvalfisInvironmental phase to final
<br />qualiked MR
<br />design and construction. Mr6 Fisher has extensive experience workingon roadway desIgn,
<br />Including Interoction and m0dian projects. His 4051$n worklilclodes horizontal and
<br />vertical geometric layout, utility coordination, traffic signal desion,-signino and striping
<br />EDUCATION
<br />design and drainage design, His projects have. incotilhorated current LID design practices
<br />Iladilot of Woo, fiol t110099.
<br />Including blefiltration, Infiltration, and detention basins.
<br />San Joe sm tifliveNty
<br />ISO Jost, CA
<br />RELEVANT EXPERIENCE
<br />PROFESS1014AL
<br />$unnyvolePovemeritRehohill,tation2Ol7 I City of Sunnyvale, CA
<br />AFFILIATIONS
<br />Mr, Fisher served as the Project Manager forthis annual street pavement rehabilitation
<br />svpo gay oflios �udidatlo
<br />prcjw� The icolbe involved the rehabilitation of 2 streett In the City of Spravvelo—, Vork
<br />(spq, �&rt prtrldtht
<br />included the design of g!lnd and 14MA overlay, diilou% utility adjustments, curb tamps,
<br />. ers Inlema(tonal
<br />concrete sidewalk, curbguttar and driveway replAcement,,sod striping plans,
<br />M. (184671
<br />Fair Oaks 41kewary and Streatscape I City of tunhyvale, CA
<br />Mr. Fisher served at the Project Manalidr for the design of Class 2 Bicycle Lanes an fair
<br />Oaks Avenue between Old San FrandsW Road to Evelyn Roautt, WerAvartue toArquos.
<br />Avenue, and Wolfe Road to Ahwanee Avenue, Key project -elements Included
<br />reconfiguring the roadway, roadway resurfacing, addition dFlireeft bike lanes,
<br />modiffartIbM to the existing concrete madianislohds, modification otparking, and
<br />installation of related sigmae. Mr. Fisher led public outreach meetings to keep the
<br />residents Informed of the project.
<br />First Street and City Alley Resurfacing Project I City of L94 Altos, CA
<br />Mr. Fisher served as the Project Manager for these two resurfacing projects, which
<br />I nvolve,robatillitation of 20 city a Ilayways as well as.Flrst Street between West Edith
<br />Avenue and Soto Street, He oversaw preparation of the project PS&C package, Basis of
<br />Design Report, and coordinated with utility owners for adjustments of their facilities.
<br />Junipero Serra at King Boulevard Intersection Improvements I C I ty of S o u th S a n
<br />Francisco, CA
<br />Mr. Fisher served as the Project Manager for this bicycle and pedestrian friendly traffic
<br />signal upgrade project, The project goat was to Improve mobility for all modes, and brings
<br />the Intersection up to current stondaeds for bicyclists, pedestrians, and ADA access,
<br />Project Included preliminary design, community outreach, agency coordination Induding
<br />Caltr;ns. The project scope IncludetIrodesIgn of the existing medians and right -turn
<br />Islands to Improve Interaction geometry and provide ADA compliance, replacement of
<br />the existing traffic signals located In the median with mast arm signals to Improve
<br />visibility, addition of a speed feedback sign on southboundlurilperoSerro, and extension
<br />of existing bike lanes along Juniparo Serra Boulevard through the King Drive Intersection
<br />to Improve bicycle safety.
<br />W. Edith and University crosswalk improvements I City of Los Altos, CA
<br />Mr, Fisher served is the Project Manager for the design of traffic calming elements to
<br />allow for safe vIsItileerossIng of Edith Avenue. The design also Included the Installation of
<br />crosewalksigns and In -ground warning lights,
<br />25E-356
<br />
|