Laserfiche WebLink
Michael <br />Fisher CSG <br />PE, GISD/P <br />Prlh0lp4I Engineer OONSUMAWS <br />1%4wo#F <br />LICENSES and <br />Mr. Fisher Is a civil engineer with over 25years of experience In civjllroadway deign, <br />CERTIFICATIONS <br />drairrage design, traffic engInaefte, specification writing, engineering report writing and <br />w0estlaw OW 140W <br />project management, He has managed teams of engiraters, working to deliver over 0 <br />$we teBeettit <br />dozen Projects ranging In size from MAW to $22,000,000 with project status ranging <br />from project Inwation/feallbility/study phase to approval/anvironmental phasetofinal <br />4ald MVP beyebmiftei&eff <br />design and construction. Mr. Fisherhas extensive experience working onroadway design, <br />1 25sis <br />Including intersection and median projetts, His design wor� tricludes horizontal and <br />vertical geometric layout titflity coordination, traffic signal design, Wilifting and Wiping <br />EDUCATION <br />design and drainage deslan.Als projects have Incorporated current LID design practice's <br />1136410r Of 149110, OVII IF11114101114, <br />Including blofiltrAition, Iriftittationand detention basins, <br />ho lose Wte univeniq <br />lies jere! (A <br />RELEVANT EXPERIENCE <br />PROFESSIONAL <br />Sunnyvale Pavement Rehabilitation 2011 [City of Sunnyvale, CA <br />AFFILIATIONS <br />Mt. Fisher served its the Project Manager fat this ormual atoat pavement r.�hetllitatlor. <br />50A Illy Inasp.01tatkel We" Agediti'al <br />Project. Thescope Involved the rehabilitation of 2 streets In the City of $urryyvale. Work <br />(SROA1 fast Ptesideal <br />Included the design of grind and HMA overlay, digatits, utilty adjustmen% curb remps, <br />Touanstatts latmational <br />concret.e.sidewalk, c^gutterand driveway replacement, and striping. plarys, <br />opw ilown <br />fedechilks mikewayond streetscope I City of Sunnyvale, CA <br />Mr. Fisherserved as the Arofect'Manager forthe design d Qass 2 Bicycle Lanes on Fair <br />OaksAvenue between Old San Fratk6sco Road totvalyn Road� 91fer Avenue to Arques <br />Avenue, and Wolfe Road to Ahwanee Avenue. Key project elements included <br />recoofigur1mg the roadway, roadway resurfacing, additl6hof green blkis lanes, <br />modifications to -the existing concrete median Islands, modification of pgrking, and <br />installation of related silinage. Mr. Fisher led public outreach meatings to keep the <br />residents lnformed�af the prqect <br />First Street ainclCity Ailey Resurfacing Project: I City of Los Altos, CA <br />Mr. Fisher served as the Project Manager for those two resurfacing projects, which <br />Involve rehabilitation of 20 city alleyways as well as First Street between West With <br />Avenue and State Street, He oversaw preparation of the project PS&rpackaoe, Oasis of <br />Design Report, and coordinated with utility owners for adjustments of their facilities. <br />Jurelpero, Serra at King Boulevard Intersection Improvements I C I ty of S o u th Sa n <br />Francisco, CA <br />Mr. Fisher served as the Project Manager for this bicycle and pedestrian friendly traffic <br />signat upgrade project, the Project goal was to Improve mobility for all modes, and brings <br />the Intersection upto current standards for bicyclists, pedestrians, and ADA access� <br />Project Included preliminary design, community outreach, agency coordination Including <br />CaftianL The project scope Included redesign of the existing medians and right-tum <br />Islands to Improve Intersection geometry and provide ADA compliance, replacement of <br />the existing traffic signals located Inthe median with mast arm signals to Improve <br />visibility, addition of a speed feedback sIsr) on southbound Juripero Serra, and extension <br />of existing bike lanes along Junipero Serra Boulevard through the King Drive intersection <br />to Improve bicycle safety. <br />W. Edith and University Crosswalk improvements I City of Los Altos, CA <br />Mr. fisher served as the Project Manager for the design of traffic calmingelements to <br />allowfor safe visible crossing ol"Edith Avenue, The design also Included the installotion of <br />crosswalk sl9m; and In -ground warning lights, <br />25E-359 <br />