Laserfiche WebLink
Professional On -call Engineering Services City of Santa Ana <br />RFP No. 17-083 <br />City of Santa Fe Spring <br />Noe Negrete, Director of PW <br />(562) 868-0511 <br />Services: Engineering <br />Start: 201S Complete: Ongoing <br />Matt Steplen, PE — PM <br />Joe Buckner, PE— Roadway E <br />Miguel Hurtado, PE — Design <br />APP Is providing a broad range of professional engineering services in support of and In close <br />coordination with the City's Public Works/Engineering Division. These services will be provided on an <br />as -needed basis through a Request for Quote for each specific project. The APP team will provide all <br />services required for this on -call professional engineering services contract Including: engineering; <br />structural engineering; engineering staff augmentation; construction management and inspection; <br />architecture, and landscape architecture. Projects to date Include: <br />Florence Avenue Widening (Orr and Day Read to Pioneer Boulevard) — <br />APP Is preparing PS&E for this roadway design project to accommodate three <br />lanes of travel In the westbound and eastbound directions, APP Is responsible <br />for performing street cores samples and percolation test data; design survey; <br />designing a longitudinal bloswale, storm drain relocations; designing options <br />IV[ VOMMUJILk �LUI U, and guttersidewalk, driveway, construction estimates for <br />each design option In Microsoft Excel; water main replacement, signing, striping and traffic signal <br />revisions; obtaining UPRR permits; and preparing construction specifications. <br />Parkmead Street Improvement Design - APP provided street design services <br />for Parkmead Street from Jersey Avenue to Pioneer Boulevard In Santa Fe <br />Springs. The project entailed the total reconstruction of the curb/gutter, <br />pavement rehabilitation, reconstruction of deteriorated sidewalk and <br />driveways and replacement of the street trees (which had contributed <br />significantly to pavement and curb uplift). The recommended pavement <br />rehabilitation resulted In significant construction cost savings by avoiding the <br />total reconstruction of the existing pavement section, <br />Citywide Pavement Evaluation and Analysis - APP Is evaluating, analyzing <br />and prioritizing the City's entire roadway system. The project Involves field <br />work to evaluate the roads, pavement corings to determine the existing <br />street structural section, identifying recommended strategies to rehabilitate <br />the streets, development of construction cost estimates and a 3-year <br />prioritization of the various projects based on the City's budget of $17 million. In conjunction with <br />APP's recommendations, we are proposing an extensive amount of pavement recycling (FDR, CIR, <br />CCPR) which will save the City up to 50% on the pavement construction costs, allowing the City to <br />significantly stretch their pavement resources. Additionally, for several the streets, we are proposing <br />to reutilize the existing base material and just recycle the A.C, portion of the pavement. <br />Citywide Sidewalk Evaluation and Analyses - APP Is providing engineering <br />services for sidewalk Inspection of the City's entire sidewalk system. The <br />scope of work Includes: development of recommendations to remedy tripping <br />hazards and non-ADA compliant sidewalks; preparation of a summary report <br />including construction cost estimates; and Incorporation of the evaluation <br />results and recommendations Into the City's existing GIS system, The project <br />ie4. res a. ens ve expe, ence on in ar ty w t t e ma menance an <br />repair of local sidewalks. APP Is responsible for providing data that is compatible with the City's <br />existing XY-Maps GIS-based system. <br />zi Y, 11 <br />25E-384 <br />ANDI RSON PENNA <br />