My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Professional On -call Engineering services <br />RFP No. 17-083 <br />City of Santa Ann <br />Jorge Roque, Public Works Atsoclate <br />310-603-0220 <br />jroque@lynwood.ca.us <br />Project Dates-, Start: 2011 Complete., 2015 <br />Services: Traffic Design <br />Project Value: Constructlow.$1 million <br />Team Members; Edward Miller (ADVANTEC) - Project <br />Wector <br />In frontof-City Han. Work Included: <br />• Pavement It9habillt8ti0h <br />• Median and PgrkWay Landscaping IniprovernentS <br />• City of Lynwood Monument signs <br />• Curb, romp an&rldoWalk following city ADA standards <br />• Yrafficoontrols <br />• Signing and.Stripling <br />* UtIliflas Cnordination <br />City of Newport Beach <br />Services. Community Outreach, <br />David Vole — Landscaping <br />100 Civic Center Drive <br />Master Plan, Design <br />Project Manager <br />Newport Beach, CA <br />Development, Construction <br />Iris Lee, Senior Civil Engineer <br />Documents, Bidding Assistance, <br />049) 644-3323 <br />Construction Services <br />flee@rfewpoetbtach.gov <br />Complete: 01/2015 <br />Construction Cost: $2 million <br />David Volz Design was commissioned by the City of Newport Beach to lead a Citizen's Advisory Panel <br />(CAP) to design new and Improved western gateway landscapes for the city. The panel Included the <br />mayor pro-tem and a select committee of local residents and business owners. The project Included 5 <br />miles of arterial streets and the critical Intersectlon of West Coast Highway and Balboa Boulevard, <br />Through a series of public meetings, the Ideas for a new aesthetic treatment along these streets <br />emerged. A new major gateway with entry monuments, walls, upgraded sidewalks, and beautiful now <br />landscape enhancements were envisioned and approved, The two-mlle stretch of West Coast <br />Highway Is to receive all now landscape treatments with new medians, and right-of-way plantings, <br />The planned scheme calls for palm trees to define theintersections, flowering trees to accent the <br />medians and street edges with waver of colorful shrubs rolling through the landscape, Innovative <br />storm water retention and cleaning strategies will be a part of the envisioned low impact design <br />Implementation, The project was named APWA Project of the Year and ASCE Community <br />a (J o <br />Nlk <br />ANDERSOW PENNA <br />25E-386 <br />
The URL can be used to link to this page
Your browser does not support the video tag.