Laserfiche WebLink
Professional On -call Engineering Services city of Santa Ana <br />RFP No. 17-083 <br />Pffl-0 "00 <br />We have assumed that there are no drainage facilities (existing or proposed) within the project limits. <br />nuffi—c con <br />We have assurned that traffic control plahs-WIll not be prepared by out learn but will be addressed In <br />the project specifications with construction phasing specified In a manner which rninirnize$ traffic <br />disruption, public Inconvonlence and lost work time, Detalled traffic control plans will be prepared by <br />the contractor which will detall each phase of construction Including construction work hours, <br />maintenance of pedestrian facilities, acceo to businesses, and. emergency vehicle access. The location <br />of construction signs, barricadesi delineators and flashing arrow signs will also be detailed on the plans. <br />The Contractor-grepared traffic control planswill be prepared In accordance with the most current <br />MUTCD. <br />motka <br />Regularly scheduled meetings are a key to keeping projects on schedule, avoiding pitfalls, and keeping <br />thellhos of communication open with the Cityso that surprises do notoccor duringthe final stages of <br />the project, Weanticipste monthly PDT meetings throughout the duration of the project. <br />Prolod M01199"M <br />The Project Management task Is d1rectedet the organization, planning and control of the project -team. <br />Activities loclWeschOuling and mooltoringof the projoclWrn, cost control and an active quality <br />control program. Quality ControLwill be -an ongoing task throughout the duration of the projot� Our <br />approach to Quality Assurance/Quality Control Is presented on the following page. <br />Description <br />Title Shoet <br />4 of SheetsW <br />1 <br />Typical Sectiongand Details <br />I <br />Roadway Plan and Profile (20-scale) <br />2 <br />Signing and Striping, <br />I <br />Landsce.pe/irrigatiDn <br />5 <br />Cross Sectlons <br />I <br />Total Shoots <br />11 <br />----------------- <br />ASSUMPTIONS <br />We have excluded the following items from our proposal, however, we can Include these If requested: <br />• water Quality (SUSMP) <br />• Pothollng <br />• Hydrology/Hydroulics/Drainage Design <br />• Traffic Control Plans <br />• Traffic Signal Plans <br />• Street Lighting <br />PHASE 3: BIDDING STAGE <br />During the bidding stage of the project, APP will assist the City In answering questions from <br />Contractors, and prepare any addenda that may be required. APP will also attend the pre -bid <br />conference and job walks as necessary. Once the bids are received, we will assist the City in analyzing <br />the bids and providing recommendation for award. <br />a g o <br />25E-392 <br />ANDERSON-PENNA <br />