Laserfiche WebLink
Ted Riddell, PG, CEG GeotechnIcal Engineering 1� <br />Education: BA/1985/Geologic Science, University of California, Santa Barbara 4�' , <br />A <br />Registrations: 1987/PG/CA #5657, 1950/CEG/CA #1775 <br />Ted Riddell, PG, CEG, has more than 30 years of experience in all phases of geotechnical projects. Ted <br />has managed or worked on projects for private and public sectors Including planning, geologic mapping, <br />coordlnatln& conducting and writing of preliminary Investigations, supervision, direction of field <br />personnel and site Inspections during grading to final drafting and report writing of completed projects, <br />RELEVANT EXPERIENCE <br />Beach Blvd/Whittier Blvd Intersection Improvement Project, City of to Habra, CA, Geotechnical project <br />manager for the pavement recommendations and percolation tests, Including obtaining permits from <br />Caltrans to conduct the testing and sampling. <br />Firestone Boulevard Improvements, City of Downey, CA, Geotechnical project manager for the <br />pavement and utility recommendations, Including pavement recycling alternatives, <br />Broadway Improvements, City of Laguna Beach, CA. Geotechnical project manager for grading, <br />pavement and utility recommendations, Including obtaining permits from the County of Orange to <br />conduct the testing and sampling. <br />Imperial Highway Improvements, City of Anaheim, CA. Geotechnical project manager for the pavement <br />and retaining wall recommendations, <br />Pavement Rehabilitation/Reconstruction of Beverly Manor Drive, City of Seal Beach, Orange County, <br />CA. Responsible for existing pavement evaluation and recommendations for Full Depth Reclamation <br />(FDR), coordinate AC coring and soil borings, analyze laboratory data, preparation of report Including <br />evaluation of subgrade soils, pavement overlays and new pavement sections. <br />City of Garden Gove, Orange County, CA. Project manager/engineering geologist for TwIntree/Chossler/ <br />Greentree Storm Drain and Sewer Improvement Project, coordinate drilling of soil boring$, analyze <br />laboratory data, preparation of report including shoring recommendations, evaluation of subgrade soils, <br />and new pavement sections. Subsequently managed the observation and testing during the construction <br />of the storm drain, sewer and pavement improvements. <br />Castalc Lake Water Agency, Los Angeles County, CA. Project manager/engineering geologist for <br />geotechnical Investigation addressing the geotechnical conditions at the site relative to the planning and <br />design phase of the Castalc Conduit Bypass Pipeline projecL Coordinated drilling program within major <br />thoroughfares and pipe jacking across San Francisquito Wash, completed detailed Geotechnical Report <br />for several alignment options, Including shoring options, Jack and bore recommendations and general <br />earthwork guidelines and specifications. <br />La Habra, Orange County, CA. As project geologist, performed a geotechnical Investigation for a 400+ <br />acre master planned residential/golf community on a former oil field, followed by management of the <br />operations of the geotechnical personnel during the rough grading of the project. Duties during grading <br />Included field geologic mapping, large ancient landslide complex removals and stabilization, slope <br />stability analyses, In- grading recommendations for remedial grading, and preparation of geotechnical <br />reports and geologic maps, <br />Rancho Mission Viejo, Orange County, CA, As project geologist, performed a geotechnIcal Investigation <br />for a sand and gravel mining operation, The Investigation was done to determine the extent of the <br />remaining minable material as well as a geotechnical review of the potential reclamation plan. Utilized <br />field geologic mapping, subsurface analyses and seismic refraction surveys In preparing the analyses. <br />RESUMES -APPENDIX Page 12 <br />,J/ <br />25E-408 <br />ANDERSON - PENNA <br />