My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kelvin Kitaoka, PLS Survey <br />Education; AS/Land Engineering-Surveylng and Mapping/1990/Land Surveyor/ <br />Rancho Santiago College, Santa Ana, CA <br />Registration: 1989/LS/Land Surveyor/CA #6178 <br />Kelvin Kitaoka, PLS, Founder and President of Kelsurveys, Inc. brings more than 35 years to the <br />surveying profession, His extensive experience has specialized In topography and boundary surveys on <br />the Big Island of Hawaii and California, He has been involved in numerous pre -design base mapping <br />surveys so other professional disciplines responsible for the planning, engineering, feasibility studies, <br />design and preparation of plans and specifications, can utilize his base mapping Information. The <br />accumulated knowledge and experience is applied to ensure high quality and timely delivery of final <br />survey documents. It's common for Kelvin to work alongside his field crew as well as office tasks such <br />as CADD work and legal description preparation. <br />RELEVANT EXPERIENCE <br />Arterial Pavement Rehabilitation, City of San Juan Capistrano, CA. Provided survey services for cross <br />sections, survey of existing cross gutters to be replaced as well as curb ramps. The project Includes <br />preparing plans, specifications and cost estimates (PS&E) for the rehabilitation and resurfacing of <br />streets as part of the City's Arterial Pavement Rehabilitation Project (CIP 15109) for Fiscal Years 2014- <br />15 and 2015-2016. <br />LIRS Federal, Riverside, CA. Principal surveyor for the 780-acre aerial and ground edit project that <br />Included approximately one mile of existing sewer line that required establishing existing flow grades, <br />Saint John Vlanney Church, Del Amo Construction, Hacienda Heights, CA. Principal surveyor for the <br />construction staking of a proposed sewer line. <br />Residential Streets Rehabilitation Program for Year 2015-16, City of Buena Park, CA. Performed as <br />surveyor -in -charge for the $2-million, Topographic Street Design Survey, Construction Staking and <br />Monument Preservation tasks covering the pre- and post -construction corner record survey and filings <br />In compliance with the Professional Land Surveyor's Act. The coverage consisted of streets within <br />approximately 10 subdivision tracts. <br />Irvine Business Center, CIP # 316310, City of Irvine CA. Principal surveyor for construction staking of <br />sidewalks, driveways and comprehensive pre- and post- construction monument preservation <br />consisting of corner records and a final record of survey map that were filed and recorded, <br />respectively. <br />Irvine Business Center, CIP # 319100, Irvine CA. Principal surveyor for the construction staking for 1-5 <br />staging and on -ramp at Culver Drive. Comprehensive pre- and post- construction monument <br />preservation consisted of corner records that were filed. <br />Industrial Street Rehabilitation Surveys, City of Buena Park, CA. Principal surveyor for the planning <br />phase of a street rehabilitation, which Included survey records research, horizontal and vertical control <br />establishment, topography, monument preservation and delivery coordination with the civil engineers <br />towards the design phase. <br />Rosecrans Avenue, Cities of Englewood to Manhattan Reach (6 Miles), CA. Principal surveyor for the <br />detailed ground -topographic survey, verification for the existing centerline monuments for record map <br />compilation for six (6) miles of roadway from the Englewood to Manhattan Beach, Provided base <br />mapping and contouring along with all of the base mapping attributes. <br />RESUMES - APPENDIX Page 13 <br />ANDFRSON r PENNA <br />rV <br />IF A IPA <br />
The URL can be used to link to this page
Your browser does not support the video tag.